INFORMATION AND DISCUSSION ON THE PLANNING OF HYDRO-QUÉBEC TRANSÉNERGIE’S TRANSMISSION SYSTEM

INTERCONNECTION PROJECTS. INFORMATION AND DISCUSSION ON THE PLANNING OF HYDRO-QUÉBEC TRANSÉNERGIE’S TRANSMISSION SYSTEM. MONTRÉAL, JUNE 7, 2013. INTERCONNECTION PROJECTS. PROJECT STATUS. HERTEL–NEW YORK LINE. Customer’s request: 1,100 MW interconnection with New York City

bowie
Download Presentation

INFORMATION AND DISCUSSION ON THE PLANNING OF HYDRO-QUÉBEC TRANSÉNERGIE’S TRANSMISSION SYSTEM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INTERCONNECTION PROJECTS INFORMATION AND DISCUSSION ON THE PLANNING OF HYDRO-QUÉBEC TRANSÉNERGIE’S TRANSMISSION SYSTEM MONTRÉAL, JUNE 7, 2013

  2. INTERCONNECTION PROJECTS

  3. PROJECT STATUS

  4. HERTEL–NEW YORK LINE • Customer’s request: 1,100 MW interconnection with New York City • Impact assessment completed in 2012 • Connected at the border to the Champlain Hudson Power Express project that runs to the Astoria substation near New York City • 320-kV (50 km) underground direct-current line between Hertel substation(La Prairie) and the Canada–United States border • Addition of a capacitor bank at Des Cantons substation (184 MVar) • Scheduled commissioning: fall 2017 • Currently in the draft-design phase

  5. HERTEL–NEW YORK LINE

  6. CHAMPLAIN HUDSON POWER EXPRESS Champlain Hudson Power Express Route

  7. DES CANTONS–NEW HAMPSHIRE LINE • Customer’s request: 1,200-MW interconnection with New England • Impact assessment completed in 2010 • 300-kV (75 km) direct current line between Des Cantons and Franklin (southern New Hampshire) substations • Construction of two 600-MW converters at Des Cantons substation • Increase the thermal rating of two 735-kV lines between Lévis and Nicolet substations • Capacity: 1,200 MW • Scheduled commissioning: 2017 • Currently in the draft-design phase

  8. DES CANTONS–NEW HAMPSHIRE LINE

  9. DES CANTONS–NEW HAMPSHIRE LINE

  10. SAINT-CÉSAIRE–BEDFORD LINE • Customers’ request: ensure the reliability of the region’s power supply and interchanges between Québec and Vermont/New England • Impact assessment completed in 2010 • 230-kV (35 km) line between St-Césaire and Bedford substations, initially operated at 120 kV with a capacity of 225 MW • Commissioning: 2014 • Project under way

  11. SAINT-CÉSAIRE–BEDFORD LINE PROJECT

  12. QUESTION PERIOD AND DISCUSSION

  13. USEFUL LINKS HYDRO-QUÉBEC’S WEB SITE:www.hydroquebec.com/en HYDRO-QUÉBEC'S PUBLICATIONS: www.hydroquebec.com/publications/en/index.html CONSTRUCTION PROJECTS: www.hydroquebec.com/projects/index.html TRANSÉNERGIE’S WEB SITE: www.hydroquebec.com/transenergie/en/index.html RELIABILITY COORDINATOR (DIRECTION – CONTRÔLE ET EXPLOITATION DU RÉSEAU) – INTRANET AND INTERNET SITE:www.hydroquebec.com/transenergie/reliability/index.html