Forward Calorimetry Taskforce Report. Brad Cox and Randy Ruchti 29 April 2010. Calorimetry Upgrade Taskforce Report and Comments Brad Cox and Randy Ruchti. While the work of the Taskforce is largely distinct from the short term plans of the

bozica
Download Presentation

Forward Calorimetry Taskforce Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Forward CalorimetryTaskforce Report Brad Cox and Randy Ruchti 29 April 2010

  2. Calorimetry Upgrade Taskforce Report and Comments Brad Cox and Randy Ruchti • While the work of the Taskforce is largely distinct from the short term plans of the • calorimetry groups, nevertheless the Taskforce represents an important voice and • Communication link between the ECAL and HCAL communities. • The long range schedule has dramatically changed: approximately 2 years of running • (till Christmas of 2011 or 1 fb-1 of data), followed by a long (one year ?) shutdown. • This shutdown will be a target for upgrade work but not the major upgrade that this • Taskforce was assembled to address. • It is our feeling that the objective of the Taskforce should expanded to include improvements of performance (for example work toward compensating calorimetry) as well as radiation hardness issues. Forward Calorimetry Taskforce Report - 29 April 2010

  3. Revised Timescale for the Phase II Upgrade (interpreted) 2010 - Decide on Physics objectives and begin simulations, taking into account any data available. ~2013 - TDR ~2012-15 - “Directed” R&D for rad hardness of components (in addition to any already performed prior to the design phase) ~2015-2020 Five years to build two endcaps IF2020 is the goal to have new endcaps, ready to roll in this schedule is tight even with the delays of the SLHC Forward Calorimetry Taskforce Report - 29 April 2010

  4. Since the last workshop… • Themes for this meeting… • Benchmarks and simulations • BSC System • Detector options • Taskforce Meetings • CMS Weeks: Dec ‘09, Mar ‘10 • Upgrade Days: Feb ’10 • Topical Meetings • Simulations: Jan ‘10 • GaAsPhotosensors: Feb ’10 • Themes for June CMS Week • Test Beam efforts • Detector developments • Simulations updates Forward Calorimetry Taskforce Report - 29 April 2010

  5. Task Force Simulation Group A meeting was held with Neu, Cox, Jessop, Bannerjee, Heltsley, Hildreth, Ruchti (January 2010, prior to Dasu taking on his new role) (Input from Greg Landsberg, Oct/Dec 2009) A first major observation is that we should do the simulations to see if we can determine when the detector will surely be degraded to the point that a halt must be declared to replace elements such as the forward calorimetry. A second major observation out of the discussion was that pileup should be addressed at the same time or even before radiation damage degradation since pileup may mask a significant portion of the degradation. Thirdly we will start by seeing what the effect of pileup and radiation damage will be in the context of the present detector as evaluated for the modes listed on the following page Forward Calorimetry Taskforce Report - 29 April 2010

  6. Benchmark Signals SM: Rare top decays SM EW and QCD - Triple gauge boson production SM EW and QCD - Triple differential cross section for jets SM Observation of Higgs->Z Beyond the SM: Heavy SUSY b jets or photons plus MET Beyond the SM: Compositeness Beyond the SM: Vector-Vector scattering Additional question; Does the extra luminosity gain you anything? Forward Calorimetry Taskforce Report - 29 April 2010

  7. From S. Dasu - Establishing Upgrade Case • Study existing analyses and identify where and when the current detector limits performance • Review PAS notes and physics TDR v.2 • Simulate the analyses at various pileup levels and identify where it breaks down without further improvements • Most analyses documented in recent times did not include pileup • Pileup can be simulated now, but we need to organize production • Additional degradation due to detector aging needs to be simulated • Include estimates in simulation now, and expect real data experience in future simulations • Simulate couple of “standard” upgraded configurations • Study how they remedy the analyses • Study how they can improve analyses if installed early Forward Calorimetry Taskforce Report - 29 April 2010

  8. S. Dasu - Simulation Status • Core CMSSW simulation program is ready • Including pileup simulation (later talks) • New geometries, materials and readout description for various detectors will remain in flux for a while • Key is to settle on one or two configurations for initial studies • One configuration is the current CMS – firstly, it is already there • Let’s get the work started with it • We need to compare newer upgrade configurations to it any way, so we can begin with that baseline • Organized simulation • There is really no dearth of resources at the moment • Many Tier-2s are under utilized • Wisconsin group can offer to produce data and host it Forward Calorimetry Taskforce Report - 29 April 2010

  9. Personnel Issues • How do we recruit people to work on upgrades, when the data is just started to be provided by LHC? • We need to rely on new students and postdocs who will work on analysis with beyond 2012 data • Can we provide them service credits for working on upgrade definition? • Nominally, this is physics work – so no service credit. But, this needs to change. • Recruiting is possible • Most crucial: Who are the experienced physicists who can help? Forward Calorimetry Taskforce Report - 29 April 2010

  10. From Mike Hildreth…event mixing • MixingModule: • “pure MC” pileup simulation; overlay simHits • multiple input sources (generators) can provide minbias, cosmics, and beam halo as backgrounds • can select range of BXs (before and after target beam crossing) that are “sampled” to add energy/noise to event of interest • fixed or poisson mean of number of interactions is a parameter • routinely run in Release Validation by offline production team • will be used for large scale production for ICHEP 2010 • “Playback” mode allows access to MC Truth information for pileup Forward Calorimetry Taskforce Report - 29 April 2010

  11. Hildreth…second approach… • DataMixingModule: • can overlay any event on any other; at Digi level • data zerobias events, for example, can be overlaid on MC • could use Data for all sources of beam-related backgrounds • could use Data for uncorrelated noise • fixed or poisson mean of overlay events is a parameter • uses same base code as MixingModule for event handling • ….would like to encourage dialogue between the Upgrade Simulation effort and the “standard” Simulation effort for sharing expertise, experiences • large knowledge base for “standard” simulation exists • upgrade should be able to leverage this Forward Calorimetry Taskforce Report - 29 April 2010

  12. Simulation updates at this meeting… • From Doug Berry – • Simulate the performance of the detector under high luminosity conditions • Verify that pileup simulation using mixing at SIM and Digi levels produce comparable results • Starting pileup simulations – an electron gun event on top of 25 min bias events • Simulate a large number of events (100k) with medium (8) and heavy (25) mixing of min bias using both SIM and Digi level mixing. • Look at basic reconstruction quantities (RecHit energies and basic cluster distributions) in all generator conditions. Forward Calorimetry Taskforce Report - 29 April 2010

  13. Forward Calorimetry Taskforce Report - 29 April 2010

  14. Report on Task Force Technology R&D The message - interests are not only in radiation hardening but also improving the detector. It is clear that the ~75 task force participants are interested in much more than just radiation damage. I. Radiation Damage Projects: a)Detector Technologies 1)Crystals for ECAL PbWO4 loaded with Mo LYSO CeF3 2) Plate calorimetry Quartz tiles with wavelength shifter 3) Gas calorimetry 4) QQ fibers for the HF 5) Liquid scintillator 6) Liquid Scintillator in quartz tubes b) Photodetector technologies (Geiger-mode devices) 1) SiPM 2) GaAs II. Performance improvements projects: a) Detector Technologies 1) Separation of Cerenkov light from scintillation light by timing and or wavelength 2) Quartz and scintillator combination for radiator to improve e/h b) Photo detector technologies 1) GaAspixelated chips sensitive different bandwidths to separate Cerenkov light from scintillation light by wavelength Forward Calorimetry Taskforce Report - 29 April 2010

  15. From Alan Bell - BSC Update Forward Calorimetry Taskforce Report - 29 April 2010

  16. BSC radiation environment Forward Calorimetry Taskforce Report - 29 April 2010

  17. Comments on the BSC Forward Calorimetry Taskforce Report - 29 April 2010

  18. Among the options… a test cell for liquid scintillators as the detection media… Forward Calorimetry Taskforce Report - 29 April 2010

  19. Planned Future Meetings of The Taskforce Upgrade Weeks 25 - 29 October Upgrade Days 24 June 15 July 30 Sep* 18 Nov During Upgrade Weeks 27 April*, 27 October* During CMS Weeks June 17*, Dec 9* Next discussion will be held at US CMS meeting at Brown May 8 * Task Force meeting dates Forward Calorimetry Taskforce Report - 29 April 2010