This project aims to convert numerous smaller empty berths into fewer, larger, and fully occupied berths at the Oakland Yacht Club Harbor. It includes budgeting, planning, permitting, design-build, construction, and ongoing maintenance. Lessons learned emphasize the importance of sustainable design and build practices to lower costs and ensure timely permitting. The outline covers the purpose, planning, permitting processes, design and construction phases, operations, maintenance, and key lessons for successful implementation.
E N D
Environmentally Sustainable Design, Construction, Maintenance, and Operation. Oakland Yacht Club Harbor Reconfiguration
Outline • Purpose • Planning • Permitting • Design Build • Construction • Operations / Maintenance Environmentally Sustainable Design, Construction, Maintenance, and Operation Oakland Yacht Club Harbor Reconfiguration
Purpose:: Convert a large number of smaller, empty berths… to a fewer number of larger (and full) berths
Planning: • Budget • Schedule • Scope of Work
Permitting: • Federal; • State; • Regional; and • Local • Lead Times • Environmental • Consultations
Design Build: • Defined Scope of Work • Control • Schedule
Dismantle; Offsite Construction; Transportation ; and Assembly
Operations & Maintenance
Lessons Learned: • Specific Project Purpose • Alternatives Analysis during Planning • Specific Scope of Work • Detailed Design Criteria • Long Lead Time for Regulatory Permits • and Natural Resource Consultations
Lessons Learned (cont’d): • Sustainable Design/Build Resulted in: • -Lower Construction Costs; • -Lower Operation / Maintenance Costs • -Timely Permitting • Allow Sufficient Lead Time for Permitting • AGC Document #415, Standard Form of • Design –Build Agreement