MIMIC WP 3 Identification and assessment of security-related risks Project meeting 7.2. 2012, Helsinki. Anne Fransas Project Manager , Technology and Transport. Working experience. Mimic / WP3, p roject m anager , 2011 Metku / WP3, project worker , 2008
E N D
MIMIC WP 3Identification and assessment of security-relatedrisksProject meeting 7.2. 2012, Helsinki Anne Fransas Project Manager, Technology and Transport
Workingexperience • Mimic / WP3, projectmanager, 2011 • Metku / WP3, projectworker, 2008 • TESA – Terminal Safety in Liquid CargoOperations, planning the project, 2008 • TETU – Improvement of Terminal Safety in Liquid CargoOperations, projectmanager, 2007 • SafetyOperations in Liquid Ports, project manager,2007 • Finnish-Russianlogisticsworkinggroup, contactmanager, 2006-2007 • UTTMER, projectmanager, 2006-2007 • Simoili (Integration of tankersimulator and terminalsimulator), projectmanager, 2006-2007 • Gateway Office Partners, Project assistant, 2003-2004 • Project secretary in EU projects, 1999-2003, 2005 KyUAS | KymiTechnology | Anne Fransas
The Main Goal (in the projectplan) • The main goal is to define security related threats of maritime oil transportation in the Baltic Sea, and to evaluate their impact on the total safety concept. IMO's adopted FSA (formal safety assessment) is the key procedure here. KyUAS | KymiTechnology | Anne Fransas
Steps / Main tasks (in the projectplan) state of the art of the security issues related to oil transportation; identification of threats using FSA procedure; recommendations for using best available risk control options and instruments in the Baltic Sea KyUAS | KymiTechnology | Anne Fransas
Activities in 2011 • Draft of literaturereview (task 1) • Participation MNE7 LOE1 seminar (task 1) • Subcontractedstudy(task 2) • Firstinterview KyUAS | KymiTechnology | Anne Fransas
Plans for year 2012 • III MilestoneJan-Apr 2012 • Firstreport (literaturereview) willbepublished (task 1) • Subcontractedstudy, requests for quotationwillbesent (task 2) • Web-basedquestionnaire -> Interviews (task 2) KyUAS | KymiTechnology | Anne Fransas
Plans for 2012 • IV MilestoneMay-Aug 2012 • International projectseminar in May (results of task1, otherwp:s and kickoff of task 3) • Preliminary report, results of interviews (task 2) • Presenting the results of task 1 • List of identifiedthreats (task 2) • Brainstormsessions (Finland, Estonia, Sweden) -> Preliminary plan for Risk Control Options (task 3) KyUAS | KymiTechnology | Anne Fransas
Plans for 2012 • V MilestoneSep-Dec 2012 • Delfoi method: choose a group of specialists to evaluate the aspects of identifiedthreats/scenariosanonymously • Brainstormsessions (Finland, Estonia, Sweden): the results of interviews and Delfoi for information and comments • Finalreport of the task 2 (results of interviews and Delfoi) • Preliminaryfindings of task 3 (recommendations for usingbestavailabelriskcontroloptions and instruments) KyUAS | KymiTechnology | Anne Fransas
Seminar on 15 May, 2012 in Kotka • Theme: Securitythreats of MaritimeOil Transport • Proposals for presentations: • WP2, WP3 and WP4 (?) • BalticSeaNetwork for MaritimeNetwork • Authorities: Finland, Sweden, Estonia • Oilcompany • Shippingcompany KyUAS | KymiTechnology | Anne Fransas
Contactinformation Anne Fransas, Project Manager, MBA Kymenlaakson ammattikorkeakoulu, University of Applied Sciences, Technology and Transport E-mail: anne.fransas@kyamk.fi Tel. +358 44 702 8506 Thankyou! KyUAS | KymiTechnology | Anne Fransas