An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RTSUpdate Response to Questions

  2. Cutting Costs by 10% • Primary method for cutting costs is to reduce service levels in the unincorporated area. • Reducing Route 75 by one bus in the peak hour would provide approximately$97,000 (11%). • Service on Route 75 was preliminarily reduced in 2012/13 tentative budget before the Board reconsidered that action in adopted budget.

  3. RTS Rate Formula • Current rate formula is based on per hour service in the unincorporated area • In absence of a regional funding source, the current situation is as fair and equitable as possible. • 9.3% of RTS service miles are in the unincorporated area. • The County funds 4.6% of RTS operating budget through annual service agreement.

  4. Reducing Stops • 201 stops in the unincorporated area • 17% of RTS stops are in unincorporated area • Could improve on-time service but would not provide cost savings • Stops are on demand • Completely unused stops are eliminated by RTS.

  5. Comprehensive Operational Analysis and Future Plans • Comprehensive Operational Analysis will begin shortly • County Staff will be a part of the Technical Review Team. • Growth of transit service outside of city limits and addition of Santa Fe student fees may be impetus for regional RTS governance discussion.

  6. Bike/Ped Program Update

  7. Issues to Discuss • Gas Tax Funded Work Program • Connector Projects • Maintenance of Multiuse Trails

  8. Upcoming Projects • SW 20th/24th Ave – Funded, Under Design • SW 8th Ave – Federal Funds, Under Design • NW 98th St – Funded, Under Design • SR 24/GRU Easement – Funded, Added as element of Archer Braid • NW 143rd Street – Funded • CR 235 A – Complete ARRA project • Archer Braid Ph 3 – Funded thorugh CP Developer’s Agreement

  9. Work Program • Add NW 69th Terrace • 0.3 Miles • $120,000

  10. Work Program • Add NW 69th Terrace

  11. Connector Projects • NW 53rd Avenue at Northwood Oaks Map • Add to Work Program or discuss with City of Gainesville • NW 63rd Terrace Map • Remove from Work Program • Northridge to NW 39th Avenue Map • Could contact Homeowner’s Association • $120,000

  12. Multiuse Path Maintenance • Interest from Citizen Group (Greater Alachua Trailkeepers) • Will provide biweekly trash cleanup and maintenance on Archer Braid Trail • Would like the County to institute an “Adopt-a-Trail” program where they might be able to have small signage recognizing donations. • Staff need to explore risk management issues.

  13. Micanopy Sidewalk Project • FDOT Transportation Alternatives Project (FKA Transportation Enhancements) • County Right of Way • Town of Micanopy applied for the funding from FDOT through the County ranking process • FDOT will hold a Town Hall Meeting on the project in Micanopy in February.

  14. Questions?