An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. North Area Consolidation Mats Wilhelmsson EATM 6 Novembre 2012

  2. Three main chapters: 06 November 2012

  3. Withtheirworkunits… 06 November 2012

  4. And a total costestimate, per group: .. 06 November 2012

  5. Cost plan (what to do whichyear) Risk score=failureprobability x impact 06 November 2012

  6. Cost plan per group: .. 06 November 2012

  7. Cost profile (kCHF) : 06 November 2012

  8. Comments: • 2013-2014 isbookedwith the renovationwork in TCC2/TDC2 • Electric networks • A bigwork package has been included for the pulsed network (EMD, ERD and transformers) • Machine protection • Markus Zerlaut proposes a machine protection system standardized as with the other machines (750kCHF ) • Radioprotection • A full transformation to RAMSES (from ARCOR) • Improved work areas for users OUTSIDE the radiation supervised areas work places, meeting room, toilets, rest- and coffee rooms. 06 November 2012

  9. After 2021, the NorthExperimantal area is a reliable, attractive and modern researchfacility for the CERN users 06 November 2012