An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Awarded PBLs F/A-18 E/F FIRST • F/A-18E/F Integrated Readiness Support Teaming (FIRST) concept, an alternative support strategy emphasizing Government/Industry partnerships, risk management and shared accountability. • Awarded May 01 • Features: • Guaranteed response time • Teaming arrangement with three NADEPs • Reliability improvements-targeted at 10% • Streamlined configuration control and obsolescence mgmt • Industry support for E/F peculiar WRAs, lower assemblies and piece- parts • Reduced cycle time • Reduced cost of ownership • Integrated funding streams

  2. Awarded PBLs Aviation Successes F-14 Night Target System Aircraft Tires E-2 Mission Computer • $16M obs over 5 years • Contractor will manage piece part inventory • Guaranteed availability 2 days • reliability guarantee of 10,000 hours MTBF (15 year warranty, 5 years priced, 2 other 5 year periods are options • loaner spares clause if reliability is not met • $66M obs over 8 years • Inv mgmt/warehousing • Obsolescence mgmt • Contractor manages wholesale (forward- positioned) ship stock • Guaranteed availability 90% in 5 days…ipg1s in 2 days • $266M obs over 15 years • 23 types...17 platforms • Inv mgmt / warehousing transportation • Guaranteed availability 95% in 2 days CONUS / 4 days OCONUS • First performance review… filled over 8000 reqn… 96.43% availability!

  3. Awarded PBLs AEGIS Spy 1 Radar • 50 Person Life Raft • $6.6M Obs over 5 years • COTS replacement for MILSPEC item • Vendor owned inventory • Commercial technology • Replacement for MK 6 25-Person Life Raft (2:1) • Over 50% cost avoidance for CV/CVNs ARC-210 Radio • $35.9M Obs Over 5 Years • Inv Mgmt/warehousing • Config/Obsolescence Mgmt...MTBF Guarantees… Growth Incentivized • Guaranteed Availability 85%/90% with Incentives… 2 Days Pri 1-3...5 Days Pri 4-15 • 4-year base contract w/ one 4-year option; $33.5M for 4-year base • 1600 line items; Transitioned from a Mini Stock Point to Full PBL; minimum fill rate of 87% … • Contractor Responsibilities: material requirements determination, requisition support, CONUS transportation and tracking, Class II ECP authority

  4. PBLs on the HorizonFY03 Outlook - Aviation Good to Go SE EWSE 11/02 F/A-18 Displays 12/02 H-60 Tip-to-Tail 6/03 Common TCAS 11/02 Engines F404 12/02 H-46 APU 6/03 EA-6b Tailpipes 11/02 H-60 Dynamic 3/03 H-53 APU 6/03 H-60 FLIR 12/02 Components Promising – FY03 P-3 EDC EA-6B Jax Hydraulics Common APR-39A v2 SE RSTS Engines T58/64 Fuel Ctrls EA-6B ASW-40/41 H-46 Rotor Head Engines F404-400 Fuel Ctrl Engines F404-402 Fuel Ctrl Engines T400 Fuel Ctrl P-3 APS-137B AV-8B HISS P-3 AIP F/A-18 Flight Surfaces F/A-18 LEF Wingfold More to Do Engines F414 GILS V-22 Tip-to-Tail EA-6B ICAPIII/TJSR Engines J52

  5. PBLs on the Horizon F404 7R Components • PBL Features • 116 NIINs ... –400 / -402 series • Availability / reliability incentives • 20% surge requirement • 5 year base • J&A at ASN awaiting approval • Next Steps • Finalize BCA • Complete PWS • Alpha contracting ... Targeting Dec '02 Award Next step ... Consumables for I-level / whole engine repair Driving towards Time On Wing (TOW) Metric

  6. PBLs on the Horizon H-60 PBL Evolution • AvionicsDynamic ComponentsTip-to-Tail • -Lockheed Martin - Sikorsky - MHSCo • - 42 Avionics - 14 major dynamic - 1331 total components componentscomponents • - Awarded May 02 - Est. award Oct 02 - Est. award Dec 02 • - $5M contract - $150M contract - $1.3B contract • - Guaranteed - Guaranteed - Guaranteed • response time response time response time • - Obsolescence - Obsolescence - Obsolescence Management Management Management • - Firm-fixed price per - Firm-fixed price per flying hourflying hour • - Guaranteed reliability improvements

  7. PBL Lessons Learned Tie profit to performance • Target new systems • Reduce initial inventory investments • Make deals attractive to industry • Long term agreements w/ incentives • Streamline the negotiation process • Deals significantly more complex than traditional contracts • Strike the right arrangement • Specific response time / reliability goals by system • Consider Title 10 upfront • Depot partnerships can be "Win-Win" Each deal is handcrafted

  8. Take-Aways • NAVICP is teaming with Industry, Systems Commands and Fleet customers to develop innovative support alternatives. • NAVICP is making significant investments of NWCF and personnel to accomplish this goal. • PBLs… Procuring the performance end state, not the how to