110 likes | 121 Views
Stay informed about the progress of 25 Corridor, Gap, and Intersection Projects, along with Policy Recommendations and the Launch of Vision Zero in Durham. Check out the latest updates on construction, trail conditions, and upcoming sidewalk projects.
E N D
Durham Update March 2018
Bike+Walk Implementation Plan - Adopted 25 Corridor Projects 25 Gap Projects 25 Intersection Projects Policy Recommendations
Blank Slide Implementation Underway
Blank Slide DocklessBikeshare
Blank Slide @movesafedurham Launch of Vision Zero Durham & Twitter
Blank Slide Old Durham-Chapel Hill Road Construction
Blank Slide Durham Belt Line Master Plan
Blank Slide West Ellerbe Creek Trail
Pavement condition • Access points • Vegetation issues • Pavement markings • Fencing • Accessibility • Stormwater (2018) Trail Condition Assessment
Upcoming in 2018 • Construction of additional sidewalk gap projects • Construction of sidewalk on Fayetteville, Avondale, Campus Walk/LaSalle St • Planning/construction of CMAQ-funded bike lane striping and bike boulevard striping/signage • Design of four federally funded bike/ped corridor projects (Hillandale, Cornwallis, Morreene, Carpenter Fletcher) and four sidewalk projects (LaSalle, NC54, Duke St, Raynor) • Design/ROW of five corridor projects from Bike+Walk Plan (Clayton, Hillsborough, Holloway, Old Oxford, Corporation). • Tactical urbanism Blank Slide