1 / 32

Robil-2

Robil-2. 16.01.2014. Today’s Objectives. Teams status and plans Review system design Review components functionality Review interfaces Demonstration of Sprint 1. Agenda. PDR- Team Status. IAI. General tasks. System Engineering OCU Low level interface IED detection simulator

briar
Download Presentation

Robil-2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Robil-2 16.01.2014

  2. Today’s Objectives • Teams status and plans • Review system design • Review components functionality • Review interfaces • Demonstration of Sprint 1

  3. Agenda

  4. PDR- Team Status IAI

  5. General tasks • System Engineering • OCU • Low level interface • IED detection simulator • Integration and testing • Safety methodology • Simulated environments

  6. Resources- people, IP People: • Project management- Yael • Project engineers- Alex, Eliya • Software engineers- Yuval, Livnat, Shraga • System integration – Michele • Safety methodology- Daniel IP: • OCU

  7. Current milestone tasks • IAI • System design and interfaces • Record and model SAHAR’s real trials area • Design safety methodology • Sprint 1:

  8. Achievements • System design and interfaces- next slides • Record and model SAHAR’s real trials area- Yuval will present • Design safety methodology- Daniel will present

  9. Near future tasks • Multi-robots- plan missions and design • Hoverer- extra view angle • small ground robot for dexterous manipulations • Level of Confidence- pre-defined autonomous response to event: • Communication degradation\loss • Obstacle detected • No solution found (PP) and more.. • Finalize design and integrate system skeleton

  10. Next milestones • CDR 20.2.14 • Freeze: functionality design and interfaces • Integration of stubs (software skeleton) • Review of internal design of all components • Sprint 2 – 6.3.14

  11. Requirements\Expectations from partners • Understand what is required from you (read the documents) • Deliver on time (the sooner the better) • Document your work • Cooperate and be responsive

  12. Design Review

  13. Top-Level Design All components: • Functionality • State machines • Interfaces • Rates Details in the documents…

  14. to OCU from SMME

  15. from WSM

  16. State machines

  17. State machines

  18. State machines

More Related