1 / 6

EA Activities

EA Activities. Maintenance of existing equipment Repair/replacement of damaged detectors Cable replacement Exchange of analogue wire chambers for delay wire chambers New installations GIF++ in NA New irradiation zone in EA ( SEC documentation scarce !) VMA Upgrade of AD BIPMs. 1,2.

brick
Download Presentation

EA Activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EA Activities

  2. Maintenance of existing equipment Repair/replacement of damaged detectors Cable replacement Exchange of analogue wire chambers for delay wire chambers New installations GIF++ in NA New irradiation zone in EA (SEC documentation scarce !) VMA Upgrade of AD BIPMs

  3. 1,2 3 4,5,6 (3)

  4. VMA (VME Module Adaptor) Needed to interface VME modules with MENA20 CPU 3 modules tested extensively in 2013 3 modules installed on test benches in lab Around 30 to be deployed in 2014 Help from BI-SW is greatly appreciated

  5. AD BIPM Upgrade Waiting for new vacuum flanges (TE/VSC) before installing IPMs Installation next week & bakeout programmed for the end of the month A new FESA class will need to be written for the VME module *This VME module will also be used for the LEIR IPMs

More Related