100 likes | 108 Views
[Company format]. Lambeth SW2. 020 8348 8180. Overview. Town Hall. Section through new atrium. Basement Plan. Ground Floor Plan. First Floor Plan. Second Floor Plan. New Civic Office building. Typical upper floor plan. View along pedestrianised Buckner Road. Main entrance atrium.
E N D
[Company format] Lambeth SW2
020 8348 8180 Overview
Town Hall Section through new atrium Basement Plan Ground Floor Plan First Floor Plan Second Floor Plan
New Civic Office building Typical upper floor plan View along pedestrianised Buckner Road Main entrance atrium Typical ground floor plan New office façade facing Brixton Hill
Our prime focus is to improve the Health & Wellbeing of the building users and to create a happy and stable community Low Carbon Design that meets the One Planet Living action plan: The new Civic Office building is to be BREEAM “Excellent” The whole Triangle site to benefit from a centralised gas CHP to generate electricity and hot water (boilers will run on bio diesel) New homes to go beyond Code Level 4, exploiting Passivhaus principles Zero waste with 95% construction waste by weight recycled Sustainable transport Local & sustainable materials Local & sustainable food Rainwater harvesting Wildlife, habitat & biodiversity Culture & community Jobs & local community Health, wellbeing & happiness Sustainability Proposals
Surplus Sites Wanless Road Hambrook House Ivor House Olive Morris House
Affordable Housing calculated overall across all the residential sites: Hambrook House Ivor House Wanless Road Mix of housing including 5 x 4-bedroom family homes with private gardens Discussions progressed with Family Mosaic HA, who fully support the scheme and offer Affordable Housing Proposals
Financial Summary Please note: the above figures do not take account of proceeds from the sale of Phoenix House or Wynne Road
Phase 1: Enterprise Centre (new Civic office building and refurbishment of Town Hall), Hambrook House, Ivor House, Wanless Road Phase 2: Olive Morris House Guaranteed minimum land values for each phase Prudential borrowing to fund Enterprise Centre → Maximum Commitment Land values from surplus sites offset → Maximum Deficit 3 month survey period after selection Maximum Commitment ±5% Maximum Deficit ±7.5% Savings against Maximum Commitment: 80% of savings to Lambeth Revaluation at drawdown of Phase 1: 100% of upside to Lambeth Revaluation at drawdown of Phase 2: 100% of upside to Lambeth Overage: 50% of development surpluses to Lambeth Commercial Summary
[Company format] Thank you