1 / 54

Value At Risk

Value At Risk. IEF 217a: Lecture Section 5 Fall 2002 Jorion Chapter 5. Value-at-Risk (VaR). Probabilistic worst case Almost “perfect storm” 1/100 year flood level. VaR Advantages. Risk -> Single number Firm wide summary Handles futures, options, and other complications

brie
Download Presentation

Value At Risk

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Value At Risk IEF 217a: Lecture Section 5 Fall 2002 Jorion Chapter 5

  2. Value-at-Risk (VaR) • Probabilistic worst case • Almost “perfect storm” • 1/100 year flood level

  3. VaR Advantages • Risk -> Single number • Firm wide summary • Handles futures, options, and other complications • Relatively model free • Easy to explain • Deviations from normal distributions

  4. Value at Risk (VaR)History • Financial firms in the late 80’s used it for their trading portfolios • J. P. Morgan RiskMetrics, 1994 • Currently becoming: • Wide spread risk summary • Regulatory

  5. Value at Risk: Methods • Methods • Delta Normal • Historical • Monte-carlo • Bootstrap

  6. Outline • Computing VaR • Interpreting VaR • Time Scaling • Regulation and VaR • Jorion 3, 5.2.5-5.2.6 • Estimation errors

  7. Computing VaR • Mark to market (value portfolio) 100 • Identify and measure risk factor variability Normal: mean = 0, std. = 0.1 over 1 month • Set time horizon 1 month • Set confidence level 5%

  8. Portfolio value today = 100, Normal returns (mean = 0, std = 10 per month), time horizon = 1 month, 5% VaR = 16.4

  9. Normal Distributions • Many VaR calculations can be done using tables • Find percentile value for confidence level for normal, mean 0, std = 1 using standard tables • For 0.05 level, this is –1.64 • Critical return (R*) = std(percentile value) = 0.1*(-1.64) = -0.164 • W* = W(1+R*) = 100(1-0.164) = 83.6 • VaR = Loss = W – W* = 100-83.6 = 16.4

  10. Normal DistributionsNonzero Mean (Absolute VaR) • Assume std = 0.10, mean = 0.05 • Critical return (R*) = mean + std(percentile value) = 0.05+0.1*(-1.64) = -0.114 • W* = W(1+R*) = 100(1-0.114) = 88.6 • VaR = Loss = W – W* = 100-88.6 = 11.4 • This is known as Absolute VaR • Absolute dollar loss

  11. Normal DistributionsNonzero Mean (Relative VaR) • Assume std = 0.10, mean = 0.05 • Critical return (R*) = mean + std(percentile value) = 0.05+0.1*(-1.64) = -0.114 • W* = W(1+R*) = 100(1-0.114) = 88.6 • Relative VaR is measured relative to expected wealth in the future • VaR = Loss = E(W) – W* = 100(1.05)-88.6 = 16.4 • This is known as Relative VaR

  12. Absolute versus Relative VaR • Absolute • Measure total loss possible against today’s wealth • Relative • Measure loss against expected increases in today’s wealth. • If portfolio is expected to grow by 10 percent, measure loss relative to this growth • If means are positive, then relative VaR will be larger (more conservative) • If means are near zero (short horizons) then they are the same

  13. Normal Distributions in Practice • Assume returns are normal • Estimate mean and std using data • Then get VaR using tables or monte-carlo

  14. Historical VaR • Use past data to build histograms • Method: • Gather historical prices/returns • Use this data to predict possible moves in the portfolio over desired horizon of interest

  15. Easy Example • Portfolio: • $100 in the Dow Industrials • Perfect index tracking • Problem • What is the 5% and 1% VaR for 1 day in the future?

  16. DataDow Industrials • dow.dat (data section on the web site) • File: • Column 1: Matlab date (days past 0/0/0) • Column 2: Dow Level • Column 3: NYSE Trading Volume (1000’s of shares)

  17. Matlab and Data Files • All data in matrix format • “Mostly” numerical • Two formats • Matlab format filename.mat • ASCII formats • Space separated • Excel (csv, common separated)

  18. Loading and Saving • Load data • “load dow.dat” • Data is in matrix dow • Save data • ASCII • save -ascii filename dow • Matlab • save filename dow

  19. Example: Load and plot dow data • Matlab: pltdow.m • Dates: • Matlab datestr function

  20. Back to our problem • Find 1 day returns, and apply to our 100 portfolio • Matlab: dnormdvar.m • Methods used • Delta normal (tables) • Historical • Note difference

  21. Outline • Computing VaR • Interpreting VaR • Time Scaling • Regulation and VaR • Jorion 3, 5.2.5-5.2.6 • Estimation errors

  22. Interpreting VAR • Benchmark measure • Compare risks across markets in company • Flag risks appearing over time • Potential loss measure • Worst loss • Equity capital

  23. Outline • Computing VaR • Interpreting VaR • Time Scaling • Regulation and VaR • Jorion 3, 5.2.5-5.2.6 • Estimation errors

  24. Time Scaling • VaR calculations can be made beyond 1 period in the future • Time scaling • Analytic • Monte-carlo

  25. Scale Factors and Analytics (Jorion) • Reminder • Let r(t) be a random return (independent over time)

  26. Scale Factors and Analytics

  27. Scaling in Words • Mean: scales with T • Std. : scales with sqrt(T) • Reminder: needs independence

  28. Three Methods • Approximate scaling • Exact (log normal) scaling • Bootstrap/monte-carlo

  29. Approximate • Assume that long horizon returns are the sum of the short horizon returns

  30. Computing VaR • Mark to market (value portfolio) 100 • Identify and measure risk factor variability Normal: mean = 0, std. = 0.1 over 1 month • Set time horizon 6 months (before 1 month) Std = sqrt(6)0.1=0.245 • Set confidence level 5%

  31. 6 Month VaR • Many VaR calculations can be done using tables • Find percentile value for confidence level for normal, mean 0, std = 1 using standard tables • For 0.05 level, this is –1.64 • Critical return (R*) = std(percentile value) = sqrt(6)*0.1*(-1.64) = -0.40 • W* = W(1+R*) = 100(1-0.40) = 60 • VaR = Loss = W – W* = 100-60 = 40

  32. Exact Methods • Assume that prices are a “geometric random walk” with normal increments

  33. Value of Portfolio at T

  34. Critical Return • Let R* be the alpha critical value for the T period log return • Now define the future wealth level at the alpha level by

  35. Computing VaR • Mark to market (value portfolio) 100 • Identify and measure risk factor variability. Assume log returns are distributed: Normal: mean = 0, std. = 0.1 over 1 month • Set time horizon 6 months (before 1 month) Std = sqrt(6)0.1=0.245 • Set confidence level 5%

  36. 6 Month VaR Exact(approximate numbers) Find percentile value for confidence level for normal, mean 0, std = 1 using standard tables • For 0.05 level, this is –1.64 • Critical return (R*) = std(percentile value) = sqrt(6)*0.1*(-1.64) = -0.40 • W* = W(1+R*) = 100*exp(-0.40) = 67 (60) • VaR = Loss = W – W* = 100-67 = 33 (40)

  37. Bootstrap Methods • If the 1 period return distribution is unknown, and you don’t want to hope the central limit theorem is working at T periods, then a bootstrap might be a good way to go • Resample 1 period returns, T at a time, and build a histogram for the T period returns • Use this to find the alpha critical value for wealth

  38. Examples From Data • Matlab: • hist10d.m • hist10dln.m

  39. Outline • Computing VaR • Interpreting VaR • Time Scaling • Regulation and VaR • Jorion 3, 5.2.5-5.2.6 • Estimation errors

  40. Regulation and Basel Capital Accord • 1988 • Minimum capital requirements • Agreed minimum for signing central banks • Why? • Avoid global systemic risk

  41. The Early Basel Formulas • Capital back must be at least 8% of “risk weighted” assets • Risk weighting increases arbitrarily across asset classes

  42. Criticism • Ignores risk mitigation (hedging) methods • Ignores diversification effects • Ignores term structure effects • Too few risk classes • Ignores market risk

  43. Standardized Model (1993) • More classes • New formulaic risk measures • Problems • Still arbitrary formulas and classes • Misses diversification effects • Ignores internal risk management methods

  44. Internal Models Approach1995 • Radical Change • Core component (VaR) • 10 trading day VaR • 99 percent confidence • Max ( last 60 days VaR, today’s VaR) • Use at least 1 year of historical data • Scale factor (3 or more) • Plus factor if bank’s numbers look unreliable

  45. Scale Adjustment • Find 99% quantile return for 10 day period • R* • Adjust this by a factor of 3 • 3*R* • Why 3? • Trying to eliminate failures

  46. An Example Using the Delta-Normal Approximation • Estimate distribution of 1 day returns • Normal, mean = 0, std = 0.01 • Find the 10 day std. • sqrt(10)*0.01 = 0.032 • Mean = 0*10 = 0 • Get the 99% return level from tables • 2.33*0.032 = 0.075

  47. An Example Using the Delta-Normal Approximation • Get the 99% return level from tables • 2.33*0.032 = -0.075 • Critical R* = (k)*0.075 = (3)*-0.075 = -0.225 • 22.5% loss Basel requires cushion for • $100 portfolio -> Capital required = $22.5 • All is standard VaR except for k

  48. Outline • Computing VaR • Interpreting VaR • Time Scaling • Regulation and VaR • Jorion 3, 5.2.5-5.2.6 • Estimation errors

  49. Estimation Errors • Value at Risk is only an estimate • What are its “confidence bands”? • Methods • Analytics (Jorion 5) • Monte-carlo

  50. Precision of Mean and Std Estimators (Jorion page 123)

More Related