210 likes | 357 Views
On Air with the New Solid State Transmitter. Presented by Jim Betz. ILA Technical Symposium, Boulder, CO 4-6 NOV 03. New Timing and Control Equipment At LSU Wildwood, NJ. New Transmitter At LSU Wildwood, NJ. Building Construction Begins At LORSTA George, WA.
E N D
On Air with the New Solid State Transmitter Presented by Jim Betz ILA Technical Symposium, Boulder, CO 4-6 NOV 03
New Transmitting Complex At LORSTA George, WA (bottom – left)
Secondary received at Master Master received at Secondary RF Gate RF Gate UTC Master Transmits SZC Secondary Transmits SZC Secondary PCI Master PCI Master UTC XMTR Delay Locus TINO Master Transmitter Delay (Secondary) (Secondary) Baseline Length (in Usec) Baseline Length (in uSEC) Loran (Secondary) Alternate TOT (Secondary) RF Gate UTC (Secondary) PCI Primary TOT (Secondary) SZC Primary TOT (Master 30 uSEC) Alternate TOT (Master) SZC Loran (Master) RF Gate Locus TINO (Master) PCI SZC UTC Timing Ladder Diagram