100 likes | 229 Views
NACES ADVANCED ELECTRONIC SEQUENCER PROGRAM FUTURE ADVANCED SEQUENCER TECHNOLOGY (FAST). AIRCREW SYSTEMS ILSMT BRIEFING. FAST PROGRAM BACKGROUND. 99 AFFORDABLE READINESS INITIATIVE SUBMITTED TO REDUCE COST OF CURRENT NACES SEQUENCER BY 50 PERCENT USING COMMERCIAL OFF THE SHELF COMPONENTS.
E N D
NACES ADVANCED ELECTRONIC SEQUENCER PROGRAMFUTURE ADVANCED SEQUENCER TECHNOLOGY (FAST) AIRCREW SYSTEMS ILSMT BRIEFING
FAST PROGRAM BACKGROUND • 99 AFFORDABLE READINESS INITIATIVE SUBMITTED TO REDUCE COST OF CURRENT NACES SEQUENCER BY 50 PERCENT USING COMMERCIAL OFF THE SHELF COMPONENTS. • NACES P3I PHASE II PROGRAM TO DEVELOP ADVANCED CAPABILITY TECHNOLOGY SEQUENCER CONCEPT ALSO USING COMMERCIAL OFF-THE-SHELF (COTS) COMPONENTS FOR REDUCED COST. • DECEMBER 98 MERGER OF BOTH PROGRAMS TO DESIGN, MANUFACTURE AND QUALIFY AN ADVANCED ELECTRONIC SEQUENCER WITH COTS COMPONENTS FOR NACES.
FAST PROGRAM DESCRIPTION • PROGRAM • QUALIFY ADVANCED SEQUENCER AND APPROVE ECP TO MEET NACES LOT 16 PRODUCTION INSTALLATION • DEVELOP OBSOLESENCE PLAN TO CONTROL COTS COMPONENTS • 10 YEAR WARRANTY FOR FAST CONCURRENT WITH PRODUCTION • NAVICP PBL TO SUPPORT BASELINE AND FAST IN THE FLEET • TECHNICAL • EVENT TIMING NOW BASED ON AIRSPEED, ALTITUDE AND NOW ALSO RESULTANT DECELERATION. LIMITS PARACHUTE OPENING LOADS. GOOD FOR EXPANDED AIRCREW POPULATION • CONTINUOUS SENSING FOR IMPROVED FAULT TOLERANCE AND OPTIMIZED PERFORMANCE • NEW REDUCED PARACHUTE DEPLOYMENT TIMING “BACK OF BOAT” MODE • IMPROVED DATA RECORDING CAPABILITY • TEMPERATURE COMPENSATION OF SENSORS • SURFACE MOUNT TECHNOLOGY • ADA95 LANGUAGE • EXPANSION CAPABILITY TO INTERFACE WITH EMERGING TECHNOLOGIES
Altitude (ft) 20000 18000 16000 14000 12000 10000 8000 6000 4000 2000 0 Velocity (KEAS) Velocity (KEAS) FAST Mode Comparison Current NACES Modes FAST NACES Modes Mode 5 Mode 5 Mode 4 Low G Recovery Mode Mode 2 Mode 1 High G Recovery Mode Mode 3 Mode 1
FASTACCOMPLISHMENTS • SYSTEMS REQUIREMENTS DOCUMENT COMPLETED • BOTH PDR AND CDR COMPLETED • HARDWARE DESIGN COMLETED • HAY WIRES INCOPORATED INTO FINAL PRODUCTION UNIT • THERMAL BATTERY DELTA QUAL COMPLETED • FLIGHT SOFTWARE COMPLETED • TEST SOFTWARE COMPLETED • HALT TESTING COMPLETED • FULL SYSTEM DVT AND QUAL • TWO INFLIGHT TESTS REMAIN • QUALIFICATION TESTING COMPLETED (FQA SCHEDULED FOR MAR 22) • DAHLGREN WORKING CURRENTLY WORKING HERO / EMI QBS • PBL WITH NAVICP FOR SUPPORT OF BASELINE AND FAST IN WORK • CURRENTLY PROCESSING ECP 9304; GOAL IS LOT 16 PRODUCTION
FAST/NACES Sequencer Reliability Overview NACES FAST Lessons Learned From NACES Field Failure Experience • HALT Proved COTS Reliability • Electronic Components 120 • Sensor Tolerance (Code 70) <7 65 • Sensor Calibration / OITS ARI • Connector Cracks <5 • Stainless Steel Connectors 93 ~132 • Projected Failures • Total Field Failures 278 52% Reduction in Field Failures