750 likes | 1.04k Views
Ambiente Federal Services. Marc Pacino, CEO. Contents. History/Background Corporate Structure Core Competencies Strategic Marketing Plan Operational Plan Strategic Partners Summary. History/Background. Marc Pacino, CEO Ambiente. Corporate Structure. Core Competencies.
E N D
Ambiente Federal Services Marc Pacino, CEO
Contents • History/Background • Corporate Structure • Core Competencies • Strategic Marketing Plan • Operational Plan • Strategic Partners • Summary
History/Background • Marc Pacino, CEO • Ambiente
Core Competencies Construction & Engineering • Vertical/Horizontal construction • Design-Build Engineering • Electrical Distribution • Fire Alarm/Suppression Systems • Roofing All systems available • Pre-Engineered Buildings • Paving and Asphalt • Underground Utilities • Mechanical Fencing & Force Protection • Airfield Lighting Systems • Fiber Optic Capabilities and installations • Interior/Exterior Renovations
Core Competencies (Cont’d) Environmental • Site investigation and remediation • SWPPP Plans for all industries • RCRA Permitting and Clean Up • Groundwater analysis and sampling • Wellhead Treatment Systems • Storm Water management • Soil, Air, and Water monitoring • Bioremediation • In-situ Soil Remediation • Waste Discharge Permitting • Hazardous materials surveys
Strategic Marketing Plan Contract Vehicles: • MATOC (Multiple Award Task Order Contract) • IFB (Invitation for Bid-Sealed Bids) • RFP (Request for Proposals) Award based on best dollar value • RFP allows for factors other than price to be considered • Past performance/.Schedule • Experience/Qualifications (see Mentor-Protégé) • Capabilities/Understanding of Scope of Work
Strategic Marketing Plan (Cont’d) Contract Vehicles: • IDIQ (Indefinite Delivery-Indefinite Quantity) • You can derive task orders on projects taking more than 3-5 years • POCA (Performance Orientated Construction Activity) • This contract vehicle is issued by Army Corps) NTE is 3 years or 3 million total Sole Source-IDIQ Contracts that allow simplified design effort in scope of work. Can effect up to 40 contracts at a time Materials/Labor negotiated per task order • BOA (Basic Ordering Agreement) Issued by NAVFAC (Navy)
Strategic Marketing Plan(Cont’d) Contract Vehicles: • MAPOCC • 8(a) Specific Awards multiple contracts to 8(a) contractors for separate geographic areas • D-B MATOC- Design-Build Multiple Award Task Order Contract • Contract value is 400 million with 5 year duration Competitively awarded to 8 contractors (3 large-5 small) Task orders values to 100K min. to 20 million max • MACC and Mini-MAC (Navy) • Same as MATOC, but delivery order limits noted in solicitation, can be different for each one
Strategic Marketing Plan(Cont’d) Market Targets Pacific Rim: • NAVFAC Pacific • NAVFAC Hawaii (PACDIV) • NAVFACENGCOM-Pearl Harbor • USCG-Honolulu • USAF Pacific Hickam-Wheeler AFB-Honolulu • Base Contracting Office Fort Shafter-Honolulu • USACE-Schofield Barracks-Honolulu • USACE-Fort Shafter • Barking Sands PMRF (Pacific Missile Range Facility) • MCAS-Kaneohe • Dept of VA-Honolulu
Strategic Marketing Plan(Cont’d) Market Targets Pacific Rim: • NAVFAC-Marianas (Guam) • USAF Anderson AFB-Guam • ACA-Wake Island • ACA (Army Contracting Agency) • Regional Contracting Office, Hawaii (RCO-HI) • USARPAC-Pacific • US Army Pacific Command Honolulu-HI • NAVSUP-Pacific Naval Support Supply • USMC Facilities-Okinawa • USAF Command-Okinawa • USCINCPAC
Strategic Marketing Plan(Cont’d) Market Targets Western: • NAWS (Naval Air Weapons Station) China Lake, Ridgecrest, CA • NAVFAC-North Island, San Diego, CA • NAS-Fallon, Fallon, NV • NAS-Lemoore, CA • Beale,AFB, CA • Travis AB, CA • Vandenberg AFB, CA • Edwards AFB, CA • NASA (Dryden) at Edwards AFB
Strategic Marketing Plan(Cont’d) Market Targets Western: • USACE-Edwards AFB • Hill AFB, Utah • Randolph-San Antonio, TX • Lackland AFB-San Antonio, TX • Goodfellow AFB-TX • Fort Sam Houston-San Antonio, TX • Kirtland AFB-New Mexico • Luke AFB-Phoenix, AZ • Davis-Monthan AFB-Tucson, AZ
Strategic Marketing Plan(Cont’d) Market Targets Western: • Los Angeles AFB-LA, CA • Nellis AFB-Las Vegas, NV • Elmendorf AFB, Anchorage, AL • MCAS-Miramar, CA • Camp Pendleton, CA • 29 Palms-29 Palms, CA • March ARB-Temecula, CA • NAVFAC-SW-San Diego, CA
Strategic Marketing Plan(Cont’d) Market Targets Western: • NAVFAC South Div-Corpus Christi, TX • Fort Hood, ACA-TX-Killeen, TX • USACE-LA District • USACE High Desert-Palmdale, CA • NAVFAC-NW-Seattle, WA • Dept of VA-CA, AZ, NV, • VA Medical Center, Palo Alto, CA
Strategic Marketing Plan(Cont’d) Market Targets Eastern: • NAVFAC SoutheastCharleston, SC and Jacksonville, FL • NAVFAC Local Base Offices: • Mayors • Kingsway • Orlando • Key West • Panama City • Pensacola • Albany • Barksdale
Strategic Marketing Plan(Cont’d) Market Targets Eastern: • NAVFAC Local Offices (cont’d): • New Orleans • Meridian • Camp Lejuene • Cherry Point • Beaufort NAV • Parris island • Corpus Christi • Fort Worth • Source Selection Center of Excellence (A-76 Studies) Charleston,SC • District of Columbia • New London
Strategic Marketing Plan(Cont’d) Market Targets Eastern: • NAVFAC Local Offices (cont’d): • NSW Crane, Il • Barksdale, LA • NAS Brunswick, Maine • NSGA, Maine • US Naval Academy, MD • NSWC Indian Head, MD • PAX River, MD • Portsmouth, NH • NAES Lakehurst, NJ • NWS Colts, Neck, NJ
Strategic Marketing Plan(Cont’d) Market Targets Eastern: • NAVFAC Local Offices (cont’s): • NFEC Northeast, Lester, PA • NICP Mechanicsburg, PS • NAS/JRB Willow Grove, PA • NWS Charleston, SC • NASA Midsouth, Millington, TN • NSWG Dahlgren, VI • NAVFAC Atlantic • NACFAC Washington, DC • NASA, FL • NASA, Huntsville, AL
Strategic Marketing Plan(Cont’d) Market Targets Eastern: • USACE: • Jacksonville, FL. • Savannah, GA • Washington, DC • Huntsville, AL • New Orleans, LA • Charleston, SC • Vicksburg, MS • Nashville, TN • Norfolk, VE • Fort Worth, TX
Strategic Marketing Plan(Cont’d) Market Targets Eastern: • US Air Force • Charleston AFB, SC • Shaw AFB, SC • Pope AFB, NC • Barksdale AFB, LA • Andrews AFB, MD • Bolling AFB, DC • Columbus AFB, MS • Goodfellow AFB, TX • Hanscom AFB, Maine • Keesler AFB, MS • Kirtland AFB, TX
Strategic Marketing Plan(Cont’d) Market Targets Eastern: • US Air Force • Lackland AFB, TX • Lajes Field, Azores • Laughlin AFB, TX • Little Rock AFB, TX • Luke AFB, AZ • MacDill AFB, FL • Maxwell AFB, AL • McGuire AFB, NJ • Minot AFB, SD • Moody AFB, GA • Moron, Spain • Patrick AFB, FL
Strategic Marketing Plan(Cont’d) Department of the Army Proposed Acquisitions Offered Exclusively for Service-Disabled Veteran-Owned Set Asides Value: $1.7 Billion
Strategic Marketing Plan(Cont’d) Joint Bio-Medical RDA Mgmt Center (IO) (Fort Detrick, MD) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $0.518 M Performance Period: TBD Estimated Solicitation Release: Fiscal Years 2009-2011 Joint Bio-Medical RDA Mgmt Center (T) (Fort Detrick, MD) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $0.415 M Performance Period: TBD Estimated Solicitation Release: Fiscal Years 2009-2011 NARMC HQ Building (T) (Forest Glen) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $0.740 M Performance Period: TBD Estimated Solicitation Release: Fiscal Year 2011
Strategic Marketing Plan(Cont’d) Radio Repairs Contracting Office: Tooele Army Depot Proposed Contract Type: Time and Materials Estimated Value: $75K per year Base Period & Options: 1 Year (with 4 Option Years) Solicitation Release: September 2007 Planning Programming Budgeting and Execution System Support Contracting Office: SMDC Proposed Contract Type: Cost Plus Fixed Fee (Sole Source to SDVOSB) Estimated Value: $1.1M Base Period & Options: 1 Year (with 2 Option Years) Solicitation Release: March 2008 Asymmetric Warfare Group, Improvised Explosive Device Contracting Office: SMDC Proposed Contract Type: ID/IQ, Single Award Estimated Value: $300M Base Period & Options: 1 Year (with 4 Option Years) Estimated Solicitation Release: January 2010
Strategic Marketing Plan(Cont’d) Research and Development for Scientific and Engineering Technical Assistance (SETA) Contracting Office: ERDC-CHL Proposed Contract Type: IDIQ Estimated Value: $6M Base Period & Options: Base Year with 4 Option Years Estimated Solicitation Release: Prior to 1 September 2007 Unmanned Aerial System Training Facility (Indiantown Gap, PA) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $2.40 M Base Period & Options: TBD Estimated Solicitation Release: Fiscal Year 2009 NARMC HQ Building (IO) (Forest Glen) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $1.3 M Performance Period: TBD Estimated Solicitation Release: Fiscal Years 2009/2010
Strategic Marketing Plan(Cont’d) Vehicle Storage Building (Air National Guard) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $1.80 M Performance Period: TBD Estimated Solicitation Release: Fiscal Year 2010 Multipurpose Athletic Fields (Fort Belvoir, VA) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $1.72 M Performance Period: TBD Estimated Solicitation Release: Fiscal Year 2012 Vet Clinic (Fort Belvoir, VA) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $1.30 M Performance Period: TBD Estimated Solicitation Release: TBD
Strategic Marketing Plan(Cont’d) Flight Control Tower (Fort Belvoir, VA) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $2.50 M Performance Period: TBD Estimated Solicitation Release: Fiscal Year 2013 ARL Research Facility (Aberdeen Proving Ground) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $2.90 M Performance Period: TBD Estimated Solicitation Release: Fiscal Year 2008 Unmanned Aerial System Training Facility (Indiantown Gap, PA) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $2.60 M Performance Period: TBD Estimated Solicitation Release: Fiscal Year 2010
Strategic Marketing Plan(Cont’d) Vehicle Maintenance Shop (Aberdeen Proving Grounds, MD) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $3.20 M Performance Period: TBD Estimated Solicitation Release: Fiscal Year 2013 Expand/Re-configure Hatfield Gate/Carpenter Road (Fort Myer, DC) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $3M Performance Period: TBD Estimated Solicitation Release: Fiscal Year 2012 911 Emergency Center (Fort Belvoir, VA) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $2.10 M Performance Period: TBD Estimated Solicitation Release: Fiscal Year 2012
Strategic Marketing Plan(Cont’d) NIBC Treatment Storage Disposal Facility (Fort Detrick, MD) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $3.40 M Performance Period: TBD Estimated Solicitation Release: Fiscal Year 2012 Drug/Alcohol Abuse Center (Fort Meade, MD) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $1.50 M Performance Period: TBD Estimated Solicitation Release: Fiscal Year 2012 Auditorium (Fort Meade, MD) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $3.20 M Performance Period: TBD Estimated Solicitation Release: Fiscal Year 2012
Strategic Marketing Plan(Cont’d) Army Community Services (Fort Meade, MD) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $2.50 M Performance Period: TBD Estimated Solicitation Release: Fiscal Year 2012 16 Contract Task Order Construction Contracts (Misc. locations) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: IDIQ “D” Firm-Fixed Price Task Order Contracts Estimated Value: $5 M Base (with four option periods at $5 M each Performance Period: FY07-FY13 – staggers starts Estimated Solicitation Release: Fiscal Year 2007- 2010 Up to 4 -Contract Task Order Construction Contracts (Fort Lee and Fort Eustis, Va.) Contracting Office: U.S. Army Corps of Engineers, Norfolk District Proposed Contract Type: IDIQ “D” Firm-Fixed Price Task Order Contracts Estimated Value: $200M Base Year + 4 Option Years Estimated Solicitation Release: Oct/Nov 2007
Strategic Marketing Plan(Cont’d) Centers of Standardization - DINING FACILITIES Ft Stewart, GA Contracting Office: U.S. Army Corps of Engineers, Norfolk District Proposed Contract Type: Firm-Fixed Price, C - Type Estimated Value: $6M - $8M Performance Period: TBD Estimated Solicitation Release: Nov/Dec 2007 Centers of Standardization - DINING FACILITIES Fort Lewis, WA Contracting Office: U.S. Army Corps of Engineers, Norfolk District Proposed Contract Type: 1-IDIQ “D” Firm-Fixed Price Task Order Contract Base + 4 Years Estimated Value: $40M Performance Period: TBD Estimated Solicitation Release: Nov/Dec 2007
Strategic Marketing Plan(Cont’d) Centers of Standardization - DINING FACILITIES Fort Sill, OK Contracting Office: U.S. Army Corps of Engineers, Norfolk District Proposed Contract Type: 1-IDIQ “D” Firm-Fixed Price Task Order Contract Base + 4 Option Years Estimated Value: $40M Performance Period: TBD Estimated Solicitation Release: Nov/Dec 2007 Centers of Standardization - DINING FACILITIES Ft Riley, KS, Ft Carson CO. Ft Leavenworth, KS, Ft Leonardwood, MO Contracting Office: U.S. Army Corps of Engineers, Norfolk District Proposed Contract Type: 3- IDIQ “D” Firm-Fixed Price Task Order Contracts Estimated Value: $75M : Base + 3 Option years Performance Period: TBD Estimated Solicitation Release: Nov/Dec 2007
Strategic Marketing Plan(Cont’d) Centers of Standardization -GENERAL INSTRUCTION BLDG- Ft Meade, MD Contracting Office: U.S. Army Corps of Engineers, Norfolk District Proposed Contract Type: 1 -Firm Fixed Price, C-Type Estimated Value: $6M - $8M Performance Period: TBD Estimated Solicitation Release: Nov/Dec 2007 Centers of Standardization -GENERAL INSTRUCTION BLDG- Ft Lewis, WA Contracting Office: U.S. Army Corps of Engineers, Norfolk District Proposed Contract Type: 1 -Firm-Fixed Price, C-Type Estimated Value: $4M to $6M Performance Period: TBD Estimated Solicitation Release: Nov/Dec 2007
Strategic Marketing Plan(Cont’d) Centers of Standardization - CLASSROOM XXI Ft Leonardwood, MO Contracting Office: U.S. Army Corps of Engineers, Norfolk District Proposed Contract Type: 1- Firm-Fixed Price, C - Type Estimated Value: $13M to $15M Performance Period: TBD Estimated Solicitation Release: Nov/Dec 2007 * Centers of Standardization – Central Issue Warehouse, Aberdeen Proving Ground Contracting Office: U.S. Army Corps of Engineers, Fort Worth District Proposed Contract Type: Firm Fixed Price, C-Type Estimated Value: $18.3M Base Period & Options: NA Estimated Solicitation Release: July 2007 * - Pending Acquisition Plan Approval
Strategic Marketing Plan(Cont’d) * Centers of Standardization – Basic Training Complex, Fort Lewis, Washington Contracting Office: U.S. Army Corps of Engineers, Fort Worth District Proposed Contract Type: Firm Fixed Price, C-Type Estimated Value: $21.2M Base Period & Options: NA Estimated Solicitation Release: Fiscal Year 2012 DHS - Material Supply Contract, Buffalo Sector Contracting Office: U.S. Army Corps of Engineers, Fort Worth District Proposed Contract Type: Firm Fixed Price, Multi-award Blanket Purchase Agreements Estimated Value: $3M Base Period & Options: 5 Years Estimated Solicitation Release: Spring/Summer 2007 * - Pending Acquisition Plan Approval
Strategic Marketing Plan(Cont’d) * Centers of Standardization – Unaccompanied Enlisted Personnel Housing, Southwest Region Contracting Office: U.S. Army Corps of Engineers, Fort Worth District Proposed Contract Type: Firm Fixed Price, SATOC Estimated Value: $23.4M Base Period & Options: 5 Years Estimated Solicitation Release: July 2007 Replace Water Storage Tank (Reservoir) (New Cumberland, PA) Contracting Office: U.S. Army Corps of Engineers, Baltimore District Proposed Contract Type: Firm-Fixed Price Construction Estimated Value: $2.70 M Performance Period: TBD Estimated Solicitation Release: FY12 * - Pending Acquisition Plan Approval
Strategic Marketing Plan(Cont’d) Centers of Standardization - Physical Fitness Centers – Fort Bragg, NC Contracting Office: Huntsville Center Proposed Contract Type: Firm Fixed Price, C-Type Estimated Value: $10.611M Performance Period: 1 Year Estimated Solicitation Release: FY08 Centers of Standardization - Ranges Fort AP Hill, VA. Contracting Office: Huntsville Center Proposed Contract Type: Firm Fixed Price, C-Type Estimated Value: $1.55M Performance Period: 1 Year Estimated Solicitation Release: FY10 Centers of Standardization - Fire, Safety & Security Centers - Fort Riley, KS Contracting Office: Huntsville Center Proposed Contract Type: Firm Fixed Price, C-Type Estimated Value: $1.419M Performance Period: 1 Year Estimated Solicitation Release: FY11
Pacific Rim Historical and Projected Workloads for NAVFAC
Pacific Rim • USMC will undergo significant transformation in the next decade: • DPRI (Guam / Okinawa / Iwakuni) …major force realignment in the Pacific (multi $B program) • BEQ 2012 Plan ... $1.7B • BEQ revitalization plan–202K • “Grow-the-Force”(GTF) end strength increase …27K add’l active duty Marines and $5B+ in new infrastructure • MARSOC construction at Camps Pendleton and Lejuene • The Basic School (TBS) phased facility upgrades at MCB Quantico • BRAC Recommendations –lead on 5; 37 others impact USMC bases • Aviation Transition Plan for MV22 and JSFUSMC Demand Signal
Pacific Rim Future Mandated Moves