USNO Software Correlator: Status Report

USNO Software Correlator: Status Report. Dave Boboltz, John Spitzak , Nicole Geiger, Dave Hall, Alan Fey, Chris Dieck. Outline USNO/WACO Background USNO Prototype Software Correlator (UPSC) Use of DiFX Recent Correlator Developments/Additions. USNO’s Role in the Geodetic Community.

britain
Download Presentation

USNO Software Correlator: Status Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. USNO Software Correlator: Status Report Dave Boboltz, John Spitzak, Nicole Geiger, Dave Hall, Alan Fey, Chris Dieck Outline • USNO/WACO Background • USNO Prototype Software Correlator (UPSC) • Use of DiFX • Recent Correlator Developments/Additions

  2. USNO’s Role in the Geodetic Community • USNO is the International Earth Rotation and Reference Systems Service (IERS) Rapid Service/Prediction Center for Earth Orientation. • USNO has several functions within the International VLBI Service for Astrometry and Geodesy (IVS). • Correlator Operations Center. • VLBI Data Analysis Center. • USNO provides several levels of data products. • Daily EOP (rapids). • Weekly EOP updates (Bulletin A). • Long-term (periodic EOP, TRF, CRF solutions).

  3. Geodetic VLBI and the IVS • Geodetic VLBI is coordinated through the IVS. • http://ivscc.gsfc.nasa.gov/

  4. WAshingtonCOrrelator (WACO) • Current MarkIV “hardware” correlator was designed and constructed by MIT Haystack Observatory and is operated in cooperation with NASA. • 1 of 4 IVS correlators • WACO, Haystack, Bonn, Japan. • Only 2 MarkIVcorrelators still in operation. • Experiencing end-of-life issues. • Move to software-based correlator.

  5. WACO Workload • Daily “Intensive” experiments • Used to measure variable rotation rate of the earth (UT1-UTC). • 7 days/week: single-baseline, 1-hour experiment. • Occasional 3-station intensives. • VLBA (MK-PT) intensives. • 1-hr / day, 7 days / week • Weekly R4 experiments • Used to measure EOP (polar motion, nutation, precession). • 1 per week: 5-8 stations, 24-hr experiment. • Other experiments • 1 per month: 2-4 stations, 24-hr CRF experiments. • 4 to 6 per year: 24-hr “R1” experiments backing up Bonn. • Occasionally: other 24-hr experiments (APSG, CONT, etc).

  6. USNO Prototype Software Correlator • Heterogeneous cluster. • 5 nodes (workstations) • 32 cores • 2 Mark5 data playback units. • 1 Gb/sethernet switch. • DiFX package installed. • Proof of concept. • Correlates geodetic VLBI data. • Correlates MK-PT Intensives. • Procurement of full software correlator cluster.

  7. DiFX Processing of Geodetic Intensives • Single baseline KK-WZ • Currently correlating Friday intensive in parallel with h/w correlator • E-transferred data written to Mark5 modules • Correlated on UPSC • difx2mark4 • Fringe-fitting in HOPS/Fourfit. • Geodetic databases created.

  8. USNO-NSF-AUI/NRAO MoA • USNO contracting with NRAO for: • Access to MK - PT baseline. • 1 hr intensive. • 7 days/week. • Continued VLBA participation in the RDV experiments. • Six 24-hr experiments per year. • Vital to the CRF and TRF. • Requires high-speed connections.

  9. Status: MK-PT Fiber Links • Pie Town link (1 Gbps). • Available March 2011. • Numerous transfers of VLBI data. • 100 - 300 Mbps to USNO. • Contract with NRAO. • FY13 Contract in process. • Mauna Kea link (1 Gbps). • Installed and available July 2011. • Numerous transfers of VLBI data. • 100 - 300 Mbps to USNO. • Contract with Univ. of Hawaii. • FY13 contract signed.

  10. VLBA MK-PT Intensive Experiments • IVS Intensive4 (INT4) series • IVS Nyyddd • Dual S/X band • 4 S-band, 12 X-band • 32 MHz/channel • ~40 min. / experiment, ~30 scans • 16 second scan lengths • Limits data to be transferred • Source lists from USNO, ICRF def. • Data fringed and analyzed. • Oct. 2011 – May 2012

  11. UT1-UTC Results Leap Seconds

  12. UT1–UTC Results: Comparison IERS C04 • Oct. 2011 – May 2012. • IVS 24-hr sessions (red). • IVS Intensives (green). • wrms = 16.1 msec. • MkPt Intensives (blue). • wrms = 54.5 msec. • Un-modeled motion likely in Pie Town antenna.

  13. New USNO Software Correlator • USNO contracted with NRAO to build correlator. • Phases I & II • Leverage NRAO DiFX/Cluster expertise • Phase I (Sept. 2012). • Replacement for current 15 station hardware correlator. • 30 compute nodes. • 16 cores/node = 480 cores • Delivered to USNO Friday! • Phase II (2013 - 2014). • Correlator expansion. • 30 station VLBI2010 compatible

  14. Phase I Correlator • 2 infrastructure nodes • 1 head node • 30 compute nodes • Diskless • Mount operating system and DiFX from infrastructure nodes • 10 Gbps Ethernet network • Arista 10GbE switch • 64 SFP+ ports • 40 Gbps bonded connection to SAN

  15. Phase I at NRAO, Socorro 7 node Test Cluster will remain at NRAO 33 node Production Cluster

  16. Phase I Delivered to USNO Mark III correlator Mark IV correlator Seismic rated rack Cluster hardware

  17. Future Plans • Get the new correlator up and running • James Robnett (NRAO) visit to USNO 24-28 Sept. • Unpack, rack, power-up, network connections. • Connect to SAN. • Test correlations off SAN. • Connect Mark5 units via 10GbE • Emulex OCe10102 10 GbpsiSCSI network adapters installed. • 6 Mark5 units available now. • Parallel operations. • Run both correlators in parallel for ~6 months. • Compare results. • Phase out Mark IV correlator • Go operational with MK-PT Intensives