60 likes | 129 Views
Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3d Athens September 2014 Closing Plenary Slides Date Submitted: 18 September 2014 Source: Thomas Kürner Company TU Braunschweig Address Schleinitzstr . 22, D-38092 Braunschweig, Germany
E N D
Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title:TG3d Athens September 2014 Closing Plenary Slides Date Submitted: 18 September 2014 Source:Thomas Kürner Company TU Braunschweig Address Schleinitzstr. 22, D-38092 Braunschweig, Germany Voice:+495313912416, FAX: +495313915192, E-Mail: t.kuerner@tu-bs.de Re:n/a Abstract: TG3d Athens September2014 Closing Plenary Slides Purpose: Report to WG 15 at closing plenary Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. Thomas Kürner (TU Braunschweig).
TG3d Athens September 2014 Closing Report Thomas Kürner, TU Braunschweig
5 sessions • Work on • Applications Requirements Document (ARD) (Document 15-14-0304-05-003d) • based on contribution (Doc.15-14-0528-00-003d, Doc.15-14-0459-00-003d) • Channel Modeling Document (CMD) (Document 15-14-0310-04-003d) • Technical Requirements Document (TRD) (Document 15-14-0309-02-003d) Sessions/Work on SupportingDocuments Thomas Kürner, TU Braunschweig
Presentation and discussion of the Liaison statement from ITU-R (Doc. 18-14-0042-00-0000) requesting comments on the ITU-R preliminary draft new report on "Technology trends of active services in the band above 275 GHz" (Doc. 18-14-0043-00-0000). • A draft answer has been prepared (Doc. 15-14-0539-02-0000) . • The plan is to finalize the document at the November meeting and forward to 802.18 Discussion on SpectrumIssues Thomas Kürner, TU Braunschweig
Listening Contribution: • Overview of ISO/IEC 17568:2013 MAC Specification (Doc. 15-14-0521-01-0000) • Thistriggered a discussion on required MAC-enhancementsfor fast link set-up in point-to-point link potentially not coveredbythecurrent PAR • Further ínvestigationsarerequiredbeforethe San Antonio meeting. • Adjustmentof Time Planning(Doc. 15-14-0155-05-0000) Other Tasks completed Thomas Kürner, TU Braunschweig
Revise the ARD, TRD and CMD and provide additional input • Review and prepare input to the answer to the Liaison statement from ITU-R WP1A • Check differences of 802.15.3 MAC and ISO/IEC 17568:2013 MAC • Conference Call on October 21st, 2014, 13h GMT + 16h GMT Action for Items fortheNovember Meeting Thomas Kürner, TU Braunschweig