Proposal From Mar ‘03

Proposal From Mar ‘03. Build barrel (pixel+strips) as Project 1 possible $3M from RIKEN (JY03-JY05) possible $5M from DOE (FY05-06) Build endcap (one or two) as Project 2 possible $4-5M from DOE (FY06-07) possible PHENIX/France DOE CD0 merit, technical, manpower, costs

Download Presentation

Proposal From Mar ‘03

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposal From Mar ‘03 • Build barrel (pixel+strips) as Project 1 • possible $3M from RIKEN (JY03-JY05) • possible $5M from DOE (FY05-06) • Build endcap (one or two) as Project 2 • possible $4-5M from DOE (FY06-07) • possible PHENIX/France • DOE • CD0 merit, technical, manpower, costs • CD1 preliminary baseline, preliminary design • CD2 approve baseline, start final design • CD3 start construction • CD4 start operations • Need to get CD0 by Fall 03 Craig Ogilvie

  2. CD0 Needs • Scientific merit • Feasible technical options • General range of project costs and construction schedule • WBS, manpower, contingency analysis • Management structure • collaboration, institutions, names Craig Ogilvie

  3. Proposed Schedule CD0 - Project 1 • June – August • develop simulations, physics • address questions raised during phenix-LOI Mar ‘03 • WBS, costs, schedule …. • Meet @BNL core week August 12-15 to review these • submit revised phenix-LOI • phenix-ec vote? • First draft of CD0 documents middle of Sept • CD0 documents submitted to DOE middle of Oct • Discussion/ agreement of schedule Craig Ogilvie

  4. Tasks/People: Commitment Needed June- Aug • Simulations (Yasuyuki, PLM, Victor, Jeff, …) • physics case, x-range, first look at integration HBD/TPC, • WBS (Craig, Yuji) • 0th level WBS started ISU MBA student (Dennis Grove) • working iteratively with Vince, Johann, Dave L, … • re-link up with PHENIX (Ed, Peter Kroon…) • Costs (Craig, Yuji) • iterate from Mar ’03 • Technical options, existing knowledge sufficient for CD0 • continue with R&D Craig Ogilvie