This update covers the launch, outgassing period, electronic checkout, and commissioning activities of SECCHI. First light was achieved on various instruments. Coordination issues were addressed between spacecraft and instruments. Additionally, communication problems and rescheduling of activities were highlighted in this report.
E N D
Current SECCHI Status • Launch occurred on October 25, 2006 • Outgassing until November 22, 2006 • Electronic checkout • Commissioning Activities Began Nov 24 • Door Closed Calibrations and Checks • First Light • SCIP-A (EUVI, COR1/2) on Dec 4 • HI-A planned on Dec 11 (now Dec 13) • SCIP-B planned on Dec 13 • HI-B TBD – after last maneuver • Fine Point System – Image Motion Compensation System • Compensates for the spacecraft jitter (now +/- 2 arc sec) • Worked perfectly – single pixel resolution (0.7 arc sec) • We just received TLM that had been collected Friday Nite • This would have been normally a minor issue that became a major one because we needed it for the HI door opening.
Spacecraft/Instrument Coordination • We have a serious problem in communication between the spacecraft and instruments • Friday afternoon, we (SECCHI) learned that on Monday, there was going to be a 45 degree offpoint maneuver • This conflicted with our plan for opening the HI door on Monday, which had been planned for several weeks. • The spacecraft has priority during this period • But they need to communicate to the general STEREO community these plans, so that we can react to them and negotiate a time that is agreeable to all • They also have just moved forward a momentum dump that had been planned to occur after the lunar flyby to this Wednesday, one hour after our rescheduled HI door opening. There was no discussion of the timing of the activity. The HI door opening is a major event and seems to be considered a minor one, • This apparent lack of concern for instrument activities is unacceptable.