1 / 1

~40-60 M$

Sector 0 FEL R&D Test Facility – Future?. 135 MeV. 250 MeV. ~40-60 M$. 135 MeV : Gun brightness optimization Test new guns Multi-bunch tests. Low charge diagnostics Emittance exchange (with added equipment). 250 MeV : Compression Studies Velocity bunching Nonlinear optics

Download Presentation

~40-60 M$

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sector 0 FEL R&D Test Facility – Future? 135 MeV 250 MeV ~40-60 M$ 135 MeV: • Gun brightness optimization • Test new guns • Multi-bunch tests. • Low charge diagnostics • Emittance exchange (with added equipment) 250 MeV: • Compression Studies • Velocity bunching • Nonlinear optics • Micro-bunch, COTR, CSR • Laser heater studies • Other Applications • Compact /efficient THz source • …. 2-10 GeV: • High-E bunch compression • short wavelength seeding, ESASE • Beam property preservation • Ultrafast diagnostics (e-/X-ray) • Multi-bunch fast kickers • Short (~1GL) undulator tests

More Related