An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Studio project: Cambridge Museum of Technology Spackman education centre refurbishment TEAM SPACKMAN Seun Adekumbi Michael Bongiorni Kevin Hopkins Muhummad Che Munaaim Polly Turton IDBE Cohort 16 & 17 11 December 2010

  2. Agenda and team backgrounds • Team and design concept • Michael: architect/project manager • Materials and fit out • Kevin Hopkins: quantity surveyor/cost manager • Access and education • Polly: environmental consultant • Costings • Muhammad: quantity surveyor • Recommendations • Seun: electrical engineer

  3. Design concept: initial thoughts • Program • Display area • Education space • Event space • Toilets • Food / tea point • Storage • Approach • Phased build-out • Modular • Shared access

  4. Design concept: phasing • Phase 1 • Flexible main volume • Exhibition space • Education / activity space • Event space • Small modular additions a) Food service • Warming kitchen / tea point • Serving counter • Seating b) Support • Toilets • Cleaning facilities • Phase 2 • Flexible main volume • As listed under Phase 1 • Reception and foyer • Large modular addition • Office / curator space • Meeting / event space • Storage space • Bulk • Sensitive • Deep / easy access

  5. Design concept: floor plan • Final layout

  6. Materials and fitout: floors, walls and ceilings EXISTING

  7. Materials and fitout: lighting, heating & ventilation • How much heat? • 50KW across space Wall mounted electric heaters EXISTING Natural ventilation using existing openable windows and skylights • How much lighting? • 500 lux teaching • 300 lux exhibition • 150 lux storage Natural daylight plus adjustable low energy LED track lighting

  8. Materials and fitout: display and storage units / cafe EXISTING

  9. Access and education: physical mobility

  10. Access and inclusion: timeline / wayfinding 1930s 1990s 2010s…

  11. Access and education: visitors / catchment Prick Willow Drainage Engine Museum Bressingham Steam and Gardens Stretham Engine • Other ideas: • Website development for Cambridge Museum of Technology • Create a technology trail across Cambridgeshire/East Anglia

  12. Costings

  13. Costings (breakdown for Option 1)

  14. Costings (breakdown for Option 2)

  15. Recommendations • Value for money (phasing / materials) • Useable (warm / dry / comfortable) • Safe (utilities / school child friendly) • Accessible (people / exhibits) • Flexible and robust until new build (Team 4)

  16. Integrated team work The design team The client The user