1 / 30

GIS Analysis in Land Management

GIS Analysis in Land Management. Presented by: Jimmy West, The Schneider Corporation. Presentation Overview:. Creating Computer Generated Watersheds Use of Drainage Calculation Software to Assess Drainage with Parcels, Watersheds & Soils Layers. Accuracy….

bronwynj
Download Presentation

GIS Analysis in Land Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GIS Analysis in Land Management Presented by: Jimmy West, The Schneider Corporation

  2. Presentation Overview: • Creating Computer Generated Watersheds • Use of Drainage Calculation Software to Assess Drainage with Parcels, Watersheds & Soils Layers

  3. Accuracy… • Fancy software does not equal accurate data • Additional data layers will only be as accurate as basemap • Parcels must be maintained and up to date through a known date – almost all GIS layers will refer back to ownership information

  4. Watersheds of the Past?

  5. Software Used to Create Computer Generated Watersheds • ESRI – ArcInfo • ESRI – Spatial Analyst Tools

  6. Data Layer Sources Needed for Computer Generated Watersheds • 2’ contours – seamless • Linear stream features – seamless and topologically correct

  7. Computer Generated Watershed Raster Processes • Elevation Raster • Flow Direction Raster • Flow Accumulation Raster • Raster Streams Layer

  8. Assumptions and Obstacles: …and 3 things to know about drainage • Assumptions • Water runs downhill • Water drains into streams • Obstacles • “Sinks” and “Peaks” • Culverts

  9. “Fill” Process for Sinks and Peaks

  10. Streams at Culverts

  11. Zoomed Stream Elevation Raster

  12. “Burning” in the Streams

  13. Creation of Computer Generated Watersheds • Hydrology Modeling extension is used to “burn in streams” and build watersheds using raster images created from contour data • Computer generated watersheds are merged/attributed to match County’s existing tiered administrative watershed system

  14. Computer Generated WatershedsThreshold = 5000 Watersheds Computer Generated WatershedsThreshold = 500 Watersheds

  15. Tiered Watershed Layer

  16. Drain Calc Overview • Preparing Data For Use in Drain Calc • Multiple assessment methodologies • One rate per acre assessments • Proportional assessments

  17. Tiered Watershed Layer

  18. Watershed/Parcel Overlay

  19. Watershed/Parcel Intersect - Lower

  20. Watershed/Parcel Intersect - Upper

  21. Watershed/Parcel/Soil Intersect

  22. Range of Watershed Assessment Options • Flat rate per benefited acre • Setting minimum assessment amount(s) • Additional assessment options • Soils • Parcel class/landuse • Distance from hydrological features • other

  23. Individual Watershed Projects

  24. Defined Watershed Project

  25. Apply Assessment Rule Selections

  26. Soil Type Rule Example

  27. Import Parcel Data

  28. Define Hearing/Notice Report Info

  29. Generate Reports/Notices

  30. Print Assessment Schedule

More Related