An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Comisión de Cooperación Ecológica Fronteriza Border Environment Cooperation Commission Elephant Butte Irrigation District North American Development Bank Elephant Butte Irrigation DistrictWater Conservation ProjectPipe Installation on Unlined Earthen Laterals

  2. Project Description • 20 Laterals • 15.0 Miles of Pipeline • Arrey System • Leasburg System • Mesilla System • 48” UltraFlo Pipe • 3-Year Construction Schedule

  3. Selection Criteria Identified as “problem areas” due to: • High seepage • High maintenance • Weed growth • Ditch breaks • Low capacity • Increase to maintain approx 35-40 cfs • Encroachments • Minimal Environmental Impact

  4. Arrey System Trujillo Lateral • Moore Lateral • Palmer Lateral • S-2 Lateral • Trujillo Lateral • Vega Lateral • Williams Lateral Vega Lateral Moore Lateral Palmer Lateral Willams Lateral S-2 Lateral

  5. Leasburg System Kerr Lateral • Corralitos Lateral • Crapps Lateral • Elwood Lateral • Kelso Lateral • Kerr Lateral • School Lateral • Utting Lateral Kelso Lateral Elwood Lateral Crapps Lateral School Lateral Corralitos Lateral Utting Lateral

  6. Mesilla System Schafer Lateral • Jiminez Lateral • Langford Lateral • McKamy Lateral • McCrummen Lateral • O’Shea Lateral • Schaefer Lateral • Strout Lateral McCrummen Lateral Strout Lateral McKamy Lateral Jiminez Lateral Langford Lateral O’Shea Lateral

  7. Project Benefits • Water Savings • Reduced Maintenance • Environmental Enhancement • Public Safety

  8. Project Benefits • Water Conserved • Almost 3.25 billion gallons (10,000 acre-feet) of water per year due to reduced seepage • Equivalent to irrigating • 2,500 acres of Pecans • 4,000 acres of Cotton • Providing Municipal water to service • 180 gal/day a population of 50,000

  9. Project Benefits • Reduced Maintenance Costs • not mowing 15 miles of piped laterals • Labor for mowing • Herbicides • Less wear and tear on equipment • Less weeds seed on fields • Farm savings due to less herbicide application • Eliminate weed plug

  10. Project Benefits • Environmental Enhancements • Less use of Herbicides • Protection from illegal dumping into open ditches • Fewer contaminants to water from soil erosion and wind-blown debris • Reduced Dust • Less travel on canal banks from EBID equipment for maintenance and operations • Multiuse development • Trails, walkways, bike paths, etc.

  11. Project Benefits • Public Safety • Reduced danger of accidents involving vehicles and/or people • Reduced water contamination • Reduced liability risks

  12. Budget Summary

  13. Construction Schedule • YEAR 1 • Williams, S-2, Kerr, Kelso, Schaefer, O’Shea, McCrummen • YEAR 2 • Trujillo, Vega, Palmer, Corralitos, Crapps, Langford, Strout • YEAR 3 • Moore, Utting, School, Elwood, Jiminez, McKamy

  14. Time Line (S-2 Lateral)

  15. Pipeline Construction

  16. GIS Integration

  17. GIS and Water Management Integration

  18. Example 1 - Existing Pipelined Lateral (Taylor Lateral) Covered Portion

  19. Example 2 - Existing Pipelined Lateral (Taylor Lateral) Manhole Access

  20. Example 3 - Existing Pipelined Lateral (Taylor Lateral) Distribution Box

  21. Where We’re At • 97% of Final Design Completed • Project Receives Grant • Bids Procurement • Construction Initiated • S-2 • Kerr • O’Shea

  22. Gate Measured D Crescent-shaped Orifice y Computed from y and D Turn-Out/Well Metering • Well Metering • Mag-Tube • Armco Gate Metering

  23. Information Dissemination

  24. Current and Future Efforts • Complete coverage of metering to turnout level • Extension of groundwater metering • Complete integration of metering systems, GIS, and databases • Develop a complete water budget for individual farms and for the District

  25. Comisión de Cooperación Ecológica Fronteriza Border Environment Cooperation Commission Elephant Butte Irrigation District North American Development Bank Thank You