160 likes | 260 Views
Documentation. State of Louisiana Division of Administration Office of Risk Management Facility Planning and Control. David M. Shapiro David M. Shapiro Disaster Planning and Recovery Consultants 4030 Wake Forest Road, Raleigh NC 27609 Tel: (919) 719-2738. October 17, 2005.
E N D
Documentation State of Louisiana Division of Administration Office of Risk Management Facility Planning and Control David M. Shapiro David M. Shapiro Disaster Planning and Recovery Consultants 4030 Wake Forest Road, Raleigh NC 27609 Tel: (919) 719-2738 October 17, 2005
Documentation = Dollars David M. Shapiro Disaster Planning & Recovery Consultants (919) 719-2738
Gathering Documentation • I) Damage Assessment • I) Repair / Replacement Evaluation • III) Planning/Design • IV) Procurement • V) Construction • VI) Summary of Documentation/Closeout David M. Shapiro Disaster Planning & Recovery Consultants (919) 719-2738
ALL DOCUMENTATION SHOULD BE IN WRITING David M. Shapiro Disaster Planning & Recovery Consultants (919) 719-2738
Damage Assessment Phase Pre-Storm Facility Condition • Provide • I) Pictures • II) Plans • III) Maintenance Records David M. Shapiro Disaster Planning & Recovery Consultants (919) 719-2738
Damage Assessment PhasePost-Storm Condition • I) Pictures • II) Written evaluations/engineering analysis/narratives (including third party) David M. Shapiro Disaster Planning & Recovery Consultants (919) 719-2738
Damage Assessment Phase Cause of Damage • I) Flood • II) Wind • Mold Remediation Estimate David M. Shapiro Disaster Planning & Recovery Consultants (919) 719-2738
Repair / ReplacementEvaluation • Copies of relevant building codes/standards • Basis For Estimated Costs • I) Contractor Estimates II) RS Means III) Other David M. Shapiro Disaster Planning & Recovery Consultants (919) 719-2738
Repair / Replacement Evaluation • I) Application of FEMA formula • II) Application of Insurance formula David M. Shapiro Disaster Planning & Recovery Consultants (919) 719-2738
Planning / Design Phase • Procedure for choosing design firm (ie pre-storm relationship) • Copies of applicable building codes/standards • Time records for employees who are working on the design phase David M. Shapiro Disaster Planning & Recovery Consultants (919) 719-2738
Procurement • Copy of procurement procedures / law • Copy of Request for Proposals • Bid Tabs • Award Letter • Contract David M. Shapiro Disaster Planning & Recovery Consultants (919) 719-2738
ConstructionReplacement / Repair • Project Management Reports • Verification/Certification of Invoices David M. Shapiro Disaster Planning & Recovery Consultants (919) 719-2738
ConstructionReplacement / Repair • Force Account Labor • I) Copies of timesheets (with detail of eligible work) • ll) Hourly rates • III) Payroll Registers • IV) Fringe Benefit Rates David M. Shapiro Disaster Planning & Recovery Consultants (919) 719-2738
ConstructionReplacement / Repair • Force account equipment • I) Equipment type • II) Equipment hours by day • III) Equipment rates • List of materials used with supporting cost documentation David M. Shapiro Disaster Planning & Recovery Consultants (919) 719-2738
Summary of Documentation • Invoices & other documentation to support all costs associated with the project David M. Shapiro Disaster Planning & Recovery Consultants (919) 719-2738
That's How To Maximize... Disaster Recovery Funding! David M. Shapiro Disaster Planning & Recovery Consultants (919) 719-2738