320 likes | 604 Views
BMG. ESTABLISHMENT OF TSUNAMI WARNING AND MITIGATION SYSTEM IN INDONESIA. Presented by : Meteorological and Geophysical Agency. Jakarta , 29 August – 01 September 2005 INDONESIA. BMG. OUTLINE. THREE INTEGRAL COMPONENT TSUNAMI WARNING SYSTEM IN INDONESIA ALERT DISSEMINATION
E N D
BMG ESTABLISHMENT OF TSUNAMI WARNING AND MITIGATION SYSTEM IN INDONESIA Presented by : Meteorological and Geophysical Agency Jakarta , 29 August – 01 September 2005 INDONESIA
BMG OUTLINE • THREE INTEGRAL COMPONENT • TSUNAMI WARNING SYSTEM IN INDONESIA • ALERT DISSEMINATION • PROGRESS REPORT
The Three Integral Components Tsunami Warning and Mitigation System BMG TECHNICAL / OPERATIONAL WORKS BMG, BAKOSURTANAL, BPPT, DJGSM LIPI, KOMINFO, POLICE, LOCAL GOV. I Hazard Assessment Warning Guidance BAPPENAS • GLOBAL • REGIONAL • NATIONAL MITIGATION - REHABILITATION EMERGENCY RESPONSE BAKORNAS PB, MINISTRIES, LOCAL GOVERNMENT CAPACITY BUILDING LIPI, BPPT, ITB RISTEK, BMG II III Mitigation Source: Int’l Tsunami Information Center; March 2005
BMG I PROJECT COMPONENT : TECHNICAL / OPERATIONAL WORKS • Establishment of Monitoring System • BMG, Meteorological and Geophysical Agency • BAKOSURTANAL, National Coordinating Agency for Survey and Mapping • BPPT, Agency for Assessment and Application Technology • DJ_GSM, Geology & Mineral Resources • KOMINFO Communication & Information • LIPI, Indonesian Science Institute • EARTHQUAKE MONITORING - Seismograph - Accelerograph • SEA MONITORING - Tide Gauge - DART Buoys • CRUSTAL DEFORMATION - GPS Network 2. Data Processing and Analysis 3. Result Dissemination
MINISTRY OF RESEARCH AND TECHNOLOGY • INDONESIAN SCIENCE INSTITUTE • NATIONAL RESEARCH • INSTITUTIONS • UNIVERSITIES PROJECT COMPONENT : ASSESSMENT/ CAPACITY BUILDING BMG II • Modeling • Simulation • Workshop/ Symposium • Training • Education Program
III PROJECT COMPONENT : MITIGATION/ REHABILITATION/EMERGENCY RESPONSE BMG • Nat’l Dev. Planning Agency • Nat’l Coordinating Board for Disaster Managemen • a. Transportation b. Mobilization • a. Roads b. Bridges c. Social Buildings d. Public Building • School Buildings • Hospitals NATIONAL EFFORT ON REHABILITATION & RECONSTRUCTION DEPT. OF TRANSPORTATION DEPT. OF PUBLIC WORK DEPT. OF COMM. & INFO DEPT. OF EDUCATION DEPT. OF HEALTH
III PROJECT COMPONENT : MITIGATION/ REHABILITATION EMERGENCY RESPONSE BMG NAT’L DEV. PLANNING AGENCY NATIONAL EFFORT ON MITIGATION AND EMERGENCY RESPON • a. Transportation b. Mobilization • a. Road, Bridges b. Tent c. Knock-Down House • Food Storage • Education • Health and Sanitary • Security and Safety DEPT. OF TRANSPORTATION BAKORNAS ; SARNAS DEPT. OF PUBLIC WORK KEM. KESRA &BULOG DEPT. OF EDUCATION DEPT. OF HEALTH DEPT. OF DEFENSE ARMY ; POLICE
BMG BPPT DAGRI LH BUP SATLAK SATKORLAK HUB GUB POLRI INSTITUTIONS ENVOLVED IN THE TSUNAMI WARNING AND MITIGATION SYSTEM DEPT RES. AGENCY NON DEPT RES. AGENCY BPPT BMG UNIVERSITIES KRT LIPI CAPACITY BUILDING LIPI, National Research Institute, Universities GSM TECHNICAL WORK The Center (BMG) KOMINFO REHABILITATION, MITIGATION, EMERGENCY RESPONSE LIPI BAKO Non Departemental Research Agencies KES SOS KEU KOMINFO BAKORNAS PBP PU Sectoral departments, local govts, armed forces and police ESDM TNI International scientific institutions NGOs
BMG ESTABLISHMENT OF EARTHQUAKE INFORMATION AND TSUNAMI WARNING CENTER
BMG EARTHQUAKE INFORMATION AND TSUNAMI WARNING SYSTEM • 160 Broad band Seismographs • 500 Accelerographs • 120 Tide Gauges • 15 DART buoys type • 1 National Processing Center • 10 Regional Processing Centers
REG. CENTER 1 REG. CENTER 10 REG. CENTER 5 REG. CENTER 4 REG. CENTER 6 NAT’L. CENTER REG. CENTER 9 REG. CENTER 2 REG. CENTER 7 REG. CENTER 3 • 160 Seismic Sensors • Distance Between Sensors +/- 100 km • 10 RC and 1 NC • Result ± 5 menit REG. CENTER 8 Indonesia Earthquake Information and Tsunami Warning Center (LONG TERM / START 2006) BMG
Seis. and Accelerograph : Record • Alarm Triggered • Automatic Processing BMG Process • DATA BASE • Historical • Simulation • DATA BASE • Historical • Simulation NAT’L TSUNAMI WARNING !! • Alarm at Nat’l EITWC • Automatic Processing Time (in Minutes) Required for Processing Warning Information Earthquake Occurence Processing Time Frame (Minute 1 – Minute 10) 1 Minute 1: Signal recorded at ≥ 5 Stations 2 • Information : • Epicenter • Magnitude • Depth ;Origin Time 3 Minute 2: Processing Interactive Analysis 4 Minute 3: EQ Parameters (Origin Time; Epicenter; Depth; Magnitude) 5 REGIONAL TSUNAMI WARNING AUTOMATIC PROCESSING/ INTERACTIVE PROCESSING Minute 4: - Database is activated - Interactive Analysis 10 Minute 5: Warning !! BUOYS – TIDE GAUGE’S MONITORING For Confirmation 30 Real Time Date For Updating Minute 10: Warning From Nat’l Center to Wider Region/ International 60 Tsunami Confirmation or Cancelation
BMG PROPOSED ACCELEROGRAPH
Tarempa TAREMPA Toli Toli Pantoloan LEGEND Analog (35) Digital (25) Proposed new sites for Tsunami Monitoring (60) NOAA/USA Proposal Existing and Proposed Tide Gauge Network BMG SOURCE : BAKOSURTANAL
BMG DART BUOYS NETWORK (PLANNED) SOURCE : BPPT
LEGEND GPS Continuous Station (9) (status 2005) Continuous GPS on Tide Gauge (National Plan) EXISTING AND PROPOSED GPS STATIONS BMG Source: Bakosurtanal, 2005
BMG SHORT TERM (END 2005) Regionalism Tsunami Warning Center /End of 2005 ( 5 Regions ) I IV V II III : Broadband Seismograph : Digital Seismograph : Accelerograph. Tide Gauge
BMG COMMITMENT ACHIEVED UP TO PRESENT • China : 10 seismo + accelero • Germany : 21 seismo + accelero • NIED-Jpn : 15 seismo + accelero • CTBTO : 5 seismo + 1 UCSD • GOI : 14 seismo + accelero • France : 2 TREMORS + upgrade
BMG PLANNED EARTHQUAKE INFORMATION AND TSUNAMI WARNING SYSTEM(COMMITTED) • 67 broad band seismographs • 77 accelerographs • 15 tide gauges • 10 DART buoys type • 1 national processing Center • 3 regional Processing Centers
PLANNED SEISMIC STATIONS (COMMITTED) BMG RSC 1 RSC 10 RSC 6 RSC 5 NSC RSC 4 RSC 9 RSC 8 RSC 2 RSC 7 RSC 3 China CTBTO Germany Indonesia Japan
DIAGRAM OF DATA – INFORMATION FLOW, FROM BMG TO THE LOCAL CITIZEN • INT’L EQ INSTITUTIONS • USGS – USA • JMA – JAPAN • IDC – UK • PTWC - USA INTERNET ROUTER VPN VPN RF GTS ALARM RF ROUTER 3 INTERNET VIDEO • BAKORNAS PBP • LOCAL GOVERNMENT • RELATED INSTITUTIONS PAGER WEB SERVER HP 2 TV STATION HANDPHONE TELEPHONE SMS BROADCAST RADIO SEISMOSERVER 3 TELEPHONE TERMINAL COASTAL AREA OR VULNERABLE AREA • PRESIDENT • VICE PRESIDENT SPECIAL FAX RADIO STA. PLANNED TSUNAMI SERVER 3 ROUTER 6 RF MGA STATION > 55 LOCATION RF 5 VSAT LINK ALARM 4 MGA REGIONAL CENTER I - V RF 5 VIDEO RF PLANNED PAGER MGA JAKARTA SEISMO SERVER HP VSAT IP VSAT LINK 2 EQ MONITORING SENSORS RF RF RADIO 1 EXISTING/ MGA (27) SEISMOMETER LEGEND PLANNED • REAL TIME • TIDE GAUGE (20) • GPS • REAL TIME • SEISMOMETER (BROADBAND)- (20) • ACCELEROGRAPH (20) PLANNED
BMG 3-D Simulation of Tsunami’s effect Source: LANDSAT ETM
BMG SIRENS FOR BANDA ACEH (PROPOSED) Nat’l / Regional Center
BMG SIRENS FOR BANDA ACEH (PROPOSED)
BMG TWS PROGRESS UP TO PRESENT • INSTALL 8 BB SEISMIC SENSORS REAL TIME TO BMG HQ • REAL TIME EARTHQUAKE PROCESSING SYSTEM IN BMG HQ (RESULT EQ LOCATION LESS THAN 15 MINUTES) • AUTOMATIC EQ INFO VIA SMS, EMAIL, WEB SITE
Email - SMS auto sending BMG List Email: ews@ristek.go.id manaek@inovasi.lipi.go.id balai5@bmg.go.id BMG EMAIL SERVER List Mobile 62815… 62816… 62813…. BMG SMS SERVER List Mobile: 60… 62… 49… BMG Sismic Data Processing List Email: nqdung@jgp.ncst.ac.vn Burin_tmd@yahoo.com Yong_miov_koon@nea.gov.sg Raw data Earthquake information AEIC SMS SERVER AEIC EMAIL SERVER
Communications system diagram BMG NATIONAL SEISMOLOGICAL CENTER AND TSUNAMI WARNING SYSTEM EXTENTION OF INFORMATION DISSEMINATION ACTIVITIES Brunei D. Data Exchange InformationExchange INDIA Cambodia Training BANGLADESH etc Indonesia PAKISTAN Lao PDR SRI LANKA Malaysia AEIC AUSTRALIA Myanmar GERMANY Philippines CHINA Vsat Singapore JAPAN Telephone Facsimile USGS Thailand GTS Vietnam PTWC Website Internet,SMS ISC TELECOMMUNICATIONSSYSTEM etc
BMG TO BE CLARIFIED • How to Integrate All Seismic Data ? • How to Process and Integrate : Sea Surface and Sea Bottom Pressure to The Interactive Mode ? • How to Integrate The Pre Calculated and Historical Data (from Database), to Automatic Processing? • How to Disseminate The Warningto The Coastal People?
BMG THANK YOU FOR YOUR ATTENTION