E N D
CWA 316(b) RULEMAKING1. SCOPE (threshold based on design intake capacity) EPA ‘04: 50 MGD = 90% of all steam-electric flow2. PERFORMANCE STANDARD (CCC-based)3. ALTERNATIVE COMPLIANCE OPTION/PEAKERS/ SPACE-CONSTRAINED4. COSTS OF CCC (metrics: per kW or per gallon)5. COMPLIANCE DATES (default/planned phase-in)