1 / 4

Water Power Peer Review

Water Power Peer Review. Z. (Daniel) Deng Thomas J. Carlson. Pacific Northwest National Laboratory Zhiqun.Deng@pnnl.gov (509) 372-6120 Thomas. C arlso n@pnnl.gov (503) 417-7562 November, 2011. DOE Water Power Program. Sensor Fish Redesign Collaboration.

bruce-olson
Download Presentation

Water Power Peer Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Water Power Peer Review Z. (Daniel) Deng Thomas J. Carlson Pacific Northwest National Laboratory Zhiqun.Deng@pnnl.gov (509) 372-6120 Thomas. Carlson@pnnl.gov (503) 417-7562 November, 2011 DOE Water Power Program Sensor Fish Redesign Collaboration

  2. Purpose, Objectives, & Integration • Project Purpose • Redesign a proven device to address current needs to observe conditions in the water passageways of hydroturbines that affect power production performance and fish passage safety • Objectives • Identify measurement applications identified by turbine designers, power production entities, research institutes, and regulators • Develop design specifications that address application needs • Build and test prototypes in the laboratory and at operating power production facilities • Integration • Place the sensor fish a commercial vendor that can build the sensor and support its use by others

  3. Technical Approach • Work with potential users to identify requirements for application • Design to meet application requirements • Perform both laboratory and full scale field tests of prototypes • Implement an innovative design to reduce deployment and recovery complexities and costs • Place the new Sensor Fish with a commercial vendor capable of building the sensor at a competitive cost and supporting its users

  4. Plan, Schedule, & Budget Schedule • Initiation: January 2012 • Completion: September 2013 • FY12 Milestones • Q2: Application Space Definition • Q3: Design Specification Finalization, Prototype Build Initiation • Q4: Complete Prototype Build, Initiate Laboratory Testing Budget • DOE Funding $300K • Partner Funding $50K • Partner In-Kind Contributions of Labor and Support for Field Testing

More Related