Flying Wire & IPM Update. 12/3/2009. IPM Work. IPM Design Studies for a second Mark –II for Main Injector and Booster have begun. Tev IPM teaching session degenerates into another onion layer being pealed away. We found two additional subtle issues. Tev IPM Issue Fixes.

bruno
Download Presentation

Flying Wire & IPM Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Flying Wire & IPM Update 12/3/2009

  2. IPM Work • IPM Design Studies for a second Mark –II for Main Injector and Booster have begun. • Tev IPM teaching session degenerates into another onion layer being pealed away. We found two additional subtle issues.

  3. Tev IPM Issue Fixes • The QIE chip is a piecewise linear device. The conversion to real numbers from the QIE data was originally done by the LabView code but this function was moved to the buffer board but the bit to do this inadvertently was not set. • The source of fluctuating signal levels and is not necessarily the vacuum. It’s mostly the Clearing Field charge time. We do see an occasional vacuum burst.

  4. Tev IPM Stages Before After Both QIE and HV Delay Fixes QIE Piecewise Linear Fix

  5. Tev IPM Measurements After Measurement Consistency

  6. Tev IPM and PBJ Measurement Measurement Before fixes PBJ and IPM Plot after both

  7. Flying Wire Status Main Injector Horizontal Operational Vertical has been replaced this morning. Waiting for beam. New lid with brand new feed through installed. Pumped down, let up, inspected, and pumped down again. Recycler: No Change Horizontal Operational Vertical has a binding feed-through. Problem is inside. Wire mounted on lid at E4R TEV: No Change All 3 wires are operational.

  8. Booster IPM Notes Has Horizontal and Vertical Operational Electrostatic collection of Ions with 8KV Clearing Field Need to be Determined Looking at Magnetic containment for collection of Electrons as in the mark-II in MI. Probably will NOT use MI style electrostatic cans (Mig-Jen Has looked at 8 GeV beam and determined that some oscillations are not seen well electrostatically at Q102. Needs more study.) Why Space Charge effects at 8GeV dominate at extraction. Can use magnets to contain electrons. (Has been modeled by Alan Hahn and Andreas Jansson but should be updated.)