100 likes | 119 Views
Detailed agenda of IEEE 802.15 Working Group meeting in Dallas, Texas, including study groups, task groups, and session objectives for November 2015.
E N D
99th Session of meetings of the IEEE 802.15 Working Group for Wireless Personal Area Networks November 8-13, 2015 Hyatt Regency Reunion Dallas, Texas, USA Robert F. Heile, Wi-SUN Alliance
802.15WG Chair Bob Heile, Wi-SUN Alliance 802.15 Vice Chairs Rick Alfvin, VeriLAN Pat Kinney, Kinney Consulting 802.15 Organization Chart Working Group Technical Editor James Gilb Secretary Pat Kinney, Kinney Consulting Assistant Secretary Mike McInnis, Boeing To add your name to the WG/TG/SG/IG reflectors please go to www.ieee802.org/15 STUDY GROUPS: SG12 Consolidated LLC (CLLC) Chair: Pat Kinney, Kinney Consulting SG4t High(er) Rate PHY (HRP) Chair, Clint Powell SG4u India 865-867 Band PHY (IBP) Chair, Phil Beecher, Wi- SUN INTEREST GROUPS IG TeraHertz (THZ) Chair: Thomas Kürner, Technische Universität Braunschweig IG Dependability (of Radio Links) Ryuji Kohno, IG High Rate Rail Communications Chair: Junhyeong Kim, ETRI IG 6Tisch Chair: Pat Kinney, Kinney Consulting IG 15.4 Guide Chair: TBD SCs for New Projects (WNG), Maintenance, Rules Chair: Pat Kinney, Kinney Consulting Task Groups TG3d 100Gbps PHY Thomas Kuerner, Chair Technische Universität Braunschweig TG4s Spectrum Resource Use (SRU) Chair: Shoichi Kitazawa, ATR Wave Engineering Laboratories TG7R Optical Wireless Communications Yeong Min Jang, Kookmin University Chair TG3e High Rate Close Proximty Chair: Andrew Estrada, Sony TG3m 15.3 Revison 1 Chair: Pat Kinney, Kinney Consulting TG8 Peer Aware Communcations Chair: Miung Lee, CUNY TG4mc 15.4 Revision 3 Chair: Pat Kinney, Kinney Consulting TG9 Key Management Protocol Chair: Robert Moskowitz, Verizon x TG4n 15.4 China MBAN PHY Chair: Liang Li, Vinno TG10 Layer 2 Routing Chair: Clint Powell TG15.4q Ultra Low Power (ULP) 15.4 Chair: Chiu Ngo, Samsung Robert F. Heile, Wi-SUN Alliance
Dallas Session ObjectivesNovember 8-13, 2015 TASK GROUP 3d –100Gbps THz PHY • Review and Discuss Contributions • Resolve comments on 15.3d change PAR/CSD • Secure EC approval to forward PAR to NesCom • Update Project Plan/Timeline TASK GROUP 3e –High Rate Close Proximity (HRCP) • Review and Discuss Contributions • Continue work on merged proposal • Update Project Plan/Timeline TASK GROUP 3m –15.3 REVISION 1 • Secure EC approval to start Sponsor Ballot Robert F. Heile, Wi-SUN Alliance
Dallas Session ObjectivesNovember 8-13, 2015 TASK GROUP 4n –China MBAN • Secure EC approval to forward to RevCom • Update Project Plan/Timeline Task Group 4q: 15.4 Ultra Low Power Amendment • Secure EC approval to forward to RevCom • Update Project Timeline accordingly TASK GROUP 4s Spectrum Resoucre Utilization(SRU) • Work on Technical Guidance Doc (TGD) • Prepare the CFP • Update Project Timeline Robert F. Heile, Wi-SUN Alliance
Dallas Session ObjectivesNovember 8-13, 2015 Study Group 4t 15.4 High(er) Rate PHY • Resolves comments on PAR/CSD if any • Secure EC approval to forward to NesCom Study Group 4u 15.4 PHY for 865-867 band in India • Resolves comments on PAR/CSD if any • Secure EC approval to forward to NesCom Task Group 15.4mc -15.4 Revision 3 • Secure EC approval to forward to RevCom • Update Revision timeline as needed. Robert F. Heile, Wi-SUN Alliance
Dallas Session ObjectivesNovember 8-13, 2015 • Task Group 7R Optical Wireless Communications • Review and discuss contributions • Continue developing TGD • Generate/Update Project Timeline • TASK GROUP-8 Peer Aware Communications • Continue work on draft • Update Project Plan/Timeline • TASK GROUP 9 –Key Management Protocol: • Sponsor Ballot Comment Resolution • Update Project Plan/Timeline Robert F. Heile, Wi-SUN Alliance
Dallas Session ObjectivesNovember 8-13, 2015 TASK GROUP 10--Layer 2 Routing (L2R): • Letter Ballot comment resolution • Update Project Plan/Timeline STUDY GROUP 12 -15.4 Consolidated LLC (CLLC) • Get updated on IETF94 outcomes • Joint Meeting with 802.1 • Continue work on draft PAR and CSD THz Interest Group: • Hear contributions relating to THz comms. • Review ongoing mission/goals/new project potential Dependability Interest Group: • Discuss Contributions • Evaluate if Study Group is warranted Robert F. Heile, Wi-SUN Alliance
Dallas Session ObjectivesNovember 8-13, 2015 High Rate Railroad Communications IG • Discuss opportunities for standards work • Review ongoing mission of the group 6 TiSCH Interest Group • Hear contributions • Get updated on IETF94 outcomes 15.4 Use Guide Interest Group • Define goals • Determine whether to move forward with an SG NEW PROJECTS SUBCOMMITTEE (WNG) • Review/discuss contributions Robert F. Heile, Wi-SUN Alliance
Upcoming Sessions • January 17-22, 2016, Hyatt Regency Atlanta, Atlanta, GA, USA, 802 Hosted Interim.* (100th Session of 802.15) • March 13-18, 2016, Sands Venetian Hotel Macau, PRC (TBC), 802 Plenary Session. • May 15-20, 2016, Hilton Waikoloa Village, Kona, HI, USA, 802 Wireless Interim Session.* • July 24-29, 2016, Grand Hyatt Manchester, San Diego, CA, USA, 802 Plenary Session • September 18-23, 2016, TBD (Europe), 802 Wireless Interim Session.* • November 6-11, 2016, Grand Hyatt San Antonio, San Antonio, TX, USA, 802 Plenary Session. Robert F. Heile, Wi-SUN Alliance