1 / 74

presented to Inadvertent Interchange Payback Taskforce North American Energy Standards Board

A CPS1-driven market for Clearing/Settling Inadvertent Interchange Simulation from an 11-Day period of 17-control-area Western-Interconnection Jan/’02 hourly data. presented to Inadvertent Interchange Payback Taskforce North American Energy Standards Board by Robert Blohm Houston

bunny
Download Presentation

presented to Inadvertent Interchange Payback Taskforce North American Energy Standards Board

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A CPS1-driven market for Clearing/Settling Inadvertent InterchangeSimulation from an 11-Day period of 17-control-area Western-Interconnection Jan/’02 hourly data presented to Inadvertent Interchange Payback Taskforce North American Energy Standards Board by Robert Blohm Houston December 10, 2003 Slide #

  2. 1 Inadvertent Interchange is more than just energy at the price of scheduled energy. It’s also unscheduled contribution or correction to frequency error.

  3. Inadvertent is a vector in a state space 2 transmission loading component energy frequency control contribution

  4. 3 b > 0 > U 0 + 10 b - 10b p U p p U p b b e e - + 10 b - - 10 b p U p p U p b b e e Dual pricing of unscheduled energy Ambiguity along the diagonal. Diagonal occurs only when frequency is high. Off-diagonals occur only when frequency is low. Revenue/Expense Unscheduled receive good bad part energy part sold pay bought

  5. 4 Four possible combinations of Priced Energy Component and Priced Frequency Control Contribution of Inadvertent Interchange

  6. 5 Case 1: Frequency High and Control Area A “Leaning” on Rest of Interconnection for 200 MWh 1. Energy Component: A pays the Interconnection $10/MWh energy price for 200 MWh = -$ 2000 2. Frequency Control Contribution: A receives from the Interconnection $15* of FCCp per MWh of Inadvertent = +$ 3000 for 200 MWh of Inadvertent Interchange that is opposite to the frequency error. *FCCp per MWh would be less than $15 if the average frequency error were smaller. 3. Net Result: A receives from the Interconnection a net total of $ 1000*. *The net result could be a payment if the average frequency error is small enough.

  7. 6 Case 2: Frequency High and Rest of Interconnection “Leaning” on Control Area A for 200 MWh 1. Energy Component: A receives from the Interconnection $10/MWh energy price for 200 MWh = +$ 2000 2. Frequency Control Contribution: A pays the Interconnection $15* of FCCp per MWh of Inadvertent = -$ 3000 for 200 MWh of Inadvertent Interchange that is contributing to the frequency error. *FCCp per MWh would be less than $15 if the average frequency error were smaller. 3. Net Result: A pays the Interconnection a net total of $ 1000*. *The net result could be a receipt if the average frequency error is small enough.

  8. 7 Case 3: Frequency Low and Control Area A “Leaning” on Rest of Interconnection for 200 MWh 1. Energy Component: A pays the Interconnection $20/MWh energy price for 200 MWh = -$ 4000 2. Frequency Control Contribution: A pays the Interconnection $15 of FCCp per MWh of Inadvertent = -$ 3000 for 200 MWh of Inadvertent Interchange that is contributing to the frequency error. 3. Net Result: A pays the Interconnection a combined total of -$ 7000.

  9. 8 Case 4: Frequency Low and Rest of Interconnection “Leaning” on Control Area A for 200 MWh 1. Energy Component: A receives from the Interconnection $20/MWh energy price for 200 MWh = +$ 4000 2. Frequency Control Contribution: A receives from the Interconnection $15 of FCCp per MWh of Inadvertent = +$ 3000 for 200 MWh of Inadvertent Interchange that is opposite to the frequency error. 3. Net Result: A receives from the Interconnection a combined total of +$ 7000.

  10. 9 Summary of the 4 cases Frequency: High Low “Leaning” by: Case 3 A pays $7000 Case 1 A receives $1000 Control Area A Rest of Interconnection Case 2 A pays $1000 Case 4 A receives $7000

  11. 10 Animation of the Clearing/Settlement of Frequency Control Contribution based on data of an 11-day period in January 2002 on 17 control-area Western Interconnection:

  12. 11

  13. 12 A Balancing Authority i's Frequency Control Contribution is a "2-dimensional average" of Inadvertent and Frequency-error each weighted by Frequency error. A "2-dimensional average" is the slope of a line from the origin through the intersection of the lines intercepting the two averages. I 4-period scatter of Balancing Authority i's i <Frequency-error, Inadvertent> 8 points I 9 < D > F , I i = = t i , t D denoted by the 4 red dots F 2 Slope is "2-dimensional average" of Inadvertent & Frequency-error Drawing prepared by Robert Blohm 4 July 5, 2003 i's Average Inadvertent 4 1 9 = = = å I I I i i , t i , t 4 4 = t 1 D I F Period t D i , t - F t 4 1 4 1 4 -2 2 1 -1 3 -4 4 Average Frequency-error 4 1 8 4 1 1 Sum = 2 9 D D = D = = å F F F t t 4 2 = t 1

  14. 13 2 D I D I D F F F Period t , t i i , t t t t 1 4 -2 -8 16 2 1 -1 -1 1 3 -4 4 -16 16 1 4 1 8 8 Sum = 2 9 -17 32 Slope is "2-dimensional average" of Inadvertent & Frequency-error weighted by Frequency-error i's Average Inadvertent weighted by Frequency-error 4 1 -17 ( ´ ) = -4¼ = = = å I I D F I D F i i , t t , t i t 4 4 = t 1 A Balancing Authority i's Frequency Control Contribution is a "2-dimensional average" of Inadvertent and Frequency-error each weighted by Frequency error. A "2-dimensional average" is the slope of a line from the origin through the intersection of the lines intercepting the two averages. 4-period scatter of Balancing Authority i's <Frequency-error, Inadvertent> points < D > F , I t i , t denoted by the 4 red dots Average Frequency-error weighted by Frequency-error I i 4 1 ( ´ ) 2 D D = D = = D 8 å F F F F 8 t t t 4 = t 1 DF -4¼ I t i,t = = 8 2 D F t D - F 8 2 8

  15. 14 Good quadrant: Inadvertent and frequency error in opposite directions. Bad quadrant: Inadvertent and frequency error in the same direction. Bad quadrant: Inadvertent and frequency error in the same direction. Bad quadrant: Inadvertent and frequency error in the same direction. Bad quadrant: Inadvertent and frequency error in the same direction. Good quadrant: Inadvertent and frequency error in opposite directions. Megawatt-Hours of Inadvertent Frequency error in Hertz -.03 -.02 -.01 +.01 +.02 +.03

  16. 15 Slope of line is red control area’s Frequency Control Contribution. It is the two-dimensional average of red control area’s frequency-error-weighted Inadvertent and frequency-error-weighted frequency error. Red control area’s 264 hourly-average Inadvertent and frequency error Line is in the good quadrants: so red control area gets paid for his Frequency Control Contribution for helping frequency. Control Area 1 (CA 1)

  17. 16 CA 2

  18. 17 Slope of the black line is two-dimensional average of the combined control areas’ frequency-error-weighted Inadvertent and frequency-error-weighted frequency error.

  19. 18 CA 3

  20. 19

  21. 20 CA 4

  22. 21

  23. 22 CA 5

  24. 23

  25. 24 CA 6

  26. 25

  27. 26 CA 7

  28. 27

  29. 28 CA 8

  30. 29

  31. 30 CA 9

  32. 31

  33. 32 CA 10

  34. 33

  35. 34 CA 11

  36. 35

  37. 36 CA 12

  38. 37

  39. 38 CA 13

  40. 39

  41. 40 CA 14

  42. 41

  43. 42 CA 15

  44. 43

  45. 44 CA 16

  46. 45

  47. 46 CA 17

  48. 47

  49. 48

  50. 49 Lines’ slopes add up to zero slope of horizontal line.