1 / 10

www.teamanalysis.com 1-866 COST HLP (267-8457)

www.teamanalysis.com 1-866 COST HLP (267-8457). William J. Hombach 540-751-(TEAM) 8326 wjhombach@teamanalysis.com.

burian
Download Presentation

www.teamanalysis.com 1-866 COST HLP (267-8457)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. www.teamanalysis.com 1-866 COST HLP (267-8457) William J. Hombach 540-751-(TEAM) 8326 wjhombach@teamanalysis.com

  2. We’re a Service Disabled, Vet Owned, Small Business (SDVOSB) located in Loudoun County, VA that specializes in cost management, cost model development, historical cost collection & analysis, and independent cost estimating & reviews. 96% D&B Overall Performance Rating Dun & Bradstreet gave Team Analysis a 96 percent overall performance rating during a recent Performance Evaluation.

  3. We offer independent cost estimates and/or reviews, and training to support QA/QC efforts. We give you the tools you need to perform advanced cost analytics and instant budget formulation. We can help you harness your historical project cost for more accurate budget formulation.

  4. For DOE For over eight years we have been helping the Department of Energy’s Environmental Management, Consolidated Business Center (DOE EMCBC) design, develop, and implement an historical cost collection system to collect historical project data from over 278 of their Decontamination & Demolition (D&D) projects. This work includes collecting, analyzing, and normalizing all costs associated with D&D facilities such as the Rocky Flats site. We are one of a few experts the DOE turns to for understanding their D&D costs. Learn more about our work on the Environmental Cost Analysis System (ECAS) at http://www.teamanalysis.com/services/historical-cost-analysis/

  5. For Navy We are currently providing on-site training at each Naval Facilities Engineering Command Center on Cost Estimating for Environmental Restoration (Preparing Defensible Government Estimates). The Navy understands that under, or over, estimating the cost of an environmental project causes an increase in the overall cost of the project. Our training courses offer effective strategies and business practices for preparing IGEs that improve the quality of cost estimates and subsequently reduce the costs of executing ER projects. Learn more about our training courses at http://www.teamanalysis.com/services/estimating-training/

  6. Forecast Costs Parametric estimating employs techniques that analyze the relationships between a project's technical, programmatic, and cost characteristics. Our cost engineers define these relationships inalgorithmic models called Cost Estimating Relationships (CERs) to produce cost estimates. With cost models, our clients can quickly develop management estimates and capture company know-how from individuals throughout their organization for high-level business forecasting and budget formulation. • Product Development • Forecasting • Operations • Marketing & Sales • Budget Formulation • Liability Estimating • Financial Reports • Mergers & Acquisitions • Feasibilities Studies • What-If Scenarios

  7. Tools We Offer Nearly 200cost models for estimating environmental cleanup technologies & activities, full life-cycle remediation and restoration costs. IDEAL is an advanced estimating system for developing and running cost models. IDEAL integrates with Excel, providing instant deployment of existing models.

  8. Used during the conceptual and preliminary planning phases of a project, where costs are difficult to estimate due to limited information. Capture high-level business process knowledge and develop a cost model in IDEAL. Then run the cost model for budget formulation, what-if’s, etc. After project completion, adjust the model using historical data to identify statistical relationships between cost and design parameters. http://www.idealestimating.com

  9. Environmental Remediation Cost Models Proven. + = Over $8 Billion Over 12 Years in use by NASA, Navy, etc. in projects budgeted The ENVision Cleanup Cost Models are a powerful suite of cost models for estimating environmental remediation used by multiple organizations, including NASA and Navy, to budget their environmental remediation projects. With ENVision you can estimate ER costs faster than traditional estimating in a less error-prone and more efficient way. Learn more at http://idealestimating.com/envision-cost-models/

  10. Thank You! www.teamanalysis.com 1-866 COST HLP (267-8457) William J. Hombach 540-751-(TEAM) 8326 wjhombach@teamanalysis.com DUNS # 011460925 Cage Code # 1P2H2 GSA Contract: GS-23F-0035Y SIN: 520-13 CCR Registered: Yes On GSA Advantage®

More Related