1 / 1

Description

(Command Ship Replacement) LCC(R). Description. Description. LCC-19. LCC(R) is a mobile, self-sustaining maritime platform with robust C4ISR capability ISO a Numbered Fleet C&C and can support Joint Force Commander and staff for in-theater afloat command and control.

buzz
Download Presentation

Description

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. (Command Ship Replacement)LCC(R) Description Description LCC-19 • LCC(R) is a mobile, self-sustaining maritime platform with robust C4ISR capability ISO a Numbered Fleet C&C and can support Joint Force Commander and staff for in-theater afloat command and control. • Crew and Staff Berthing ~700. • ICD approved by JCB and anticipate JROC approval in July ‘08. • FY ’08 funding for an Analysis of Alternatives is available. Program Status Issues • The Navy currently operates one dedicated command ship, which also serve as the flagship for the COMSEVENTHFLEET: • USS Blue Ridge (LCC-19) – COMSEVENTHFLEET (Decom FY19) • MSC currently operates one dedicated command ship • USS Mount Whitney (LCC/JCC-20) – COMSIXTHFLEET • The current ships have been in service for 33 to 40 years. • Program now has an RDT&E budget of 52.4M (FY08-13) as per Congressional Budget Item Justification dated Feb. 2007 • Current funds will support LCC(R) related ICD, CD, AOA, CDD and other LCC(R) preliminary design and feasibility study efforts necessary to obtain a Program Decision to proceed with functional designs. • FY08: R3B Completed, plan Acquisition MS A/B and execution of AoA, including concept studies and cost estimates. Approval of ICD. • FY09: Complete AoA and MS documentation, develop acquisition strategy, develop CDD, Specs and contract documentation for ECP mod and C4I design. • FY10: CDD complete, negotiate and contract award ECP and C4I design • FY11: MS B planning and documentation. • FY12: Complete MS B prep, ECP and C4I designs. • LCC(R) - Landing Command and Control may garner a higher BISOG bill that could migrate to other AE platforms, ie. LPD-17 (10th & 11th) or T-AKE MPF(F). Plan is to incorporate Joint C4I as a plug-in for the ship. • Resource sponsor is N-86. 1st LCC(R) Procurement in FY-12. Program is for 2 ships. Cost estimates for ship are expected at ~$2B per hull. • Initial direction from OPNAV is to use LPD 17 as a common hull form for future Amphibious vessels to include LCC(R). 3-8

More Related