1 / 23

DFC on behalf of controls software and electronics groups Tango meeting March 19 th 2007

Status of Alba Controls. DFC on behalf of controls software and electronics groups Tango meeting March 19 th 2007. Outline. EDMS Project follow up, Naming Projects Timing, EPS, PSS, Fast interlocks Vacuum, RF,IDs, Power Converters, Linac, Diagnostics, Motors Installation. Cabling

byrd
Download Presentation

DFC on behalf of controls software and electronics groups Tango meeting March 19 th 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of Alba Controls DFC on behalf of controls software and electronics groups Tango meeting March 19th 2007

  2. Outline • EDMS Project follow up, Naming • Projects • Timing, EPS, PSS, Fast interlocks • Vacuum, RF,IDs, Power Converters, Linac, Diagnostics, Motors • Installation. Cabling • Schedule

  3. Project’s follow up

  4. EDMS: Technical specs

  5. Timing • Communication of events. • Events are generated by: • Internal counters (32 bit) • External trigger signal or software. • Optic event fiber: multimode 850 nm. • 25 ps rms jitter in the output and one event • ~280 Event receivers

  6. Operators interfacestiming tests:

  7. Fast interlocks and fast data loggers General Interlock DetectionTTL In EVG FIM-2 Timing Fan Out FIM-1 Input Output 150m Optic Duplex Fiber 150m Optic Duplex Fiber 150m Optic Duplex Fiber FIM-4 Input Output FIM-2 Input Output FIM-2 Patch Panel Timing Fan Out Timing Fan Out Patch Panel Timing Fan Out Output Input FIM-3 EVR FIM-1 FIM-1 EVR EVR FIM-1 EVR EVR FIM-1 TTL Remote Interlock from Timing System TTL Remote Interlock from Timing System TTL Remote Interlock from Timing System

  8. Equipment Protection System

  9. Vacuumracks

  10. PSS

  11. Diagnostics • BLM • Bergoz + Cosylab • 485 • CCD • Prosilica GigE • Frame grabber + Video • Euresys + Jai • Liberas • Server (soleil) • + Python libraries

  12. Vacuum Controls: • Ion Pumps • Varian double ? • Penning & IMG • MKS ? • Valves • Controlled by PLCs • GUIs. See presentation by

  13. RF LAb • 1 Transmitter • 1 Cavity • Test of tunning of the plungger • ADLINK DI/DO. • Test of Analog LLRF regulation • ADLINK AI/AO • Test of Digital LLRF regulation. • Sundance • 1 PSS

  14. Icepapcms: Config tool for motors IcePaP Microstepping (8A, 70V, 330W) Motion test bench Human interfaces Motion Configuration • System/Crate level • Name of the driver • Status • Current… • Limit switches • For each driver: • Enable/disable • Double click to configure it.

  15. Power converters • Digital regulation • Ethernet connections • Correctors and Fast Orbit Feed Back • Specification going on Linac • ?

  16. Beamlines

  17. Installation: cable databases

  18. Schedule • 2007 RF, Vaccum protos, Diagnostics, etc. Linac • 2008 Preinstallation Installation Commissioning • 2009 Commissioning ID inst. ID commissioning

  19. Thank you for your attention J.V.Gigante T.Coutinho R.Ranz J.Ribas O.Matilla L.Krause S.Rubio P.Readman R.Suñé F.Becheri R.Butzbach E.Taurel D.Fernández S.Blanch D.Beltran

  20. Clients(GUI, Scripts) Dserver (TANGO) Application programs API Hardware Hardware ABB Wago Beckhof CPCI Siemens • General components • Crates CPCI (CPU: ADLINK & INOVA) • ADC/DAC/Counter (NI & ADLINK) • PLC bench test • Siemens, Wago, Beckhoff, ABB

More Related