TESLA Linear Collider. What is new since St. Malo?. Recommendation by the German Science Council Technical developments Organisation of the community Management proposal for the project. WR- Recommendation concerning TESLA.

cady
Download Presentation

TESLA Linear Collider

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TESLA Linear Collider What is new since St. Malo? Recommendation by the German Science Council Technical developments Organisation of the community Management proposal for the project Albrecht Wagner, ECFA/DESY, Prague, Nov02

  2. WR-Recommendation concerning TESLA The German Science council has converted its statement on 14 November into a recommendation. The Science Council requests the Federal Government to give its binding consent to German participation in the TESLA LC as soon as possibleafter the project proposal has been submitted with specific details concerning international funding and international cooperation. The Science Council requests the Federal Government to give its binding consent to German participation in the TESLA X-FEL project as soon as possibleafter the revised project proposal has been submitted. DESY has answered on 24 October to the SC. Albrecht Wagner, ECFA/DESY, Prague, Nov02

  3. The Updated Proposal for the XFEL Albrecht Wagner, ECFA/DESY, Prague, Nov02

  4. First Cluster Experiments at TTF • Interaction of Intense Radiation (100 nm) with Matter • Measurement of • multi-photon processes • cross sections • life time of intermediate states • Coulomb explosion • as function of intensity VUV-Laser Increasing intensity Albrecht Wagner, ECFA/DESY, Prague, Nov02

  5. First Results IpXe = 12.1 eV Ephot= 12.8 eV (Th.Möller et al.) Albrecht Wagner, ECFA/DESY, Prague, Nov02

  6. Transverse Emittance Measurement Example Intensity behind a slit mask Image taken on August 16, 2002 gradient  29 MV/m Charge = 0.5 nC RMS size at EMSY: 1.71 mm / 1.23 mm Albrecht Wagner, ECFA/DESY, Prague, Nov02

  7. Cooperation with SLAC on FEL MoU between DESY and SLAC on a close collaboration in X-ray laser research, to make joint efforts to promote this trend-setting field of research: ”Collaborative Research Effort to Enable the Exploitation of the Scientific Capabilities of the Linac Coherent Light Source (SLAC project LCLS)and the TESLA X-Ray Free-Electron Laser ”. The Memorandum was signed on Friday, November 1, in the Department of Energy (DOE)in Washington The MoU specifies the exchange of personnel, equipment, research results and data, as well as know-how.This will accelerate and contribute to the scientific programs of both facilities, which complement one another in their qualities. Albrecht Wagner, ECFA/DESY, Prague, Nov02

  8. Status and Next Steps The North German Science ministers have given TESLA officially their backing. The SC regards the funding of facilities of this size as continuous process Public discussion has started (DPG meeting, KET) Thus it considers the recommendation to be the basis for further necessary discussions on support The SC will submit concrete recommendations on the priorities for implementation, which take into account the science policy debate on the goals and funding of the facilities Political decision expected in 2003 Albrecht Wagner, ECFA/DESY, Prague, Nov02

  9. The TESLA Collaboration • The TESLA Collaboration has grown further: • - 44 Institutes in 12 countries, Spain has joined Albrecht Wagner, ECFA/DESY, Prague, Nov02

  10. R&D Tasks and Schedules Hans Weise Albrecht Wagner, ECFA/DESY, Prague, Nov02

  11. The Way to 35 MV/m – and 800 GeV Improvement of surface quality with electro-polishing Single cell cavities, EP 800 GeV goal 40 MV/m 30 CERN/KEK/Saclay/DESY collaboration Transition from single-cell results to multi-cell results has again been successful Albrecht Wagner, ECFA/DESY, Prague, Nov02

  12. Other New Test Results • Successful test of superstructure (2 pairs of 7-cell cavities) • Test of module 1* with beam: • Was built 3 years ago • Was exposed in EXPO 2000 • Old couplers • Average Gradient with all cavities on resonance: 23.0 MV/m Albrecht Wagner, ECFA/DESY, Prague, Nov02

  13. Research Campus Ellerhoop Site Planning Status We prepare to start the legal procedure required for an implementation at the site in a few months, as part of the overall feasibility study Albrecht Wagner, ECFA/DESY, Prague, Nov02

  14. Gov Gov Gov LC Steering Groups ICFA initiative: Asian SG European SG US SG ECFA International LC SC Albrecht Wagner, ECFA/DESY, Prague, Nov02

  15. ILCSC Albrecht Wagner, ECFA/DESY, Prague, Nov02

  16. ILCSC ILCSC started to work in July, had two meeting and began to address the issues: Albrecht Wagner, ECFA/DESY, Prague, Nov02

  17. ILCSC Members Albrecht Wagner, ECFA/DESY, Prague, Nov02

  18. ILCSC Report by Maury Tigner on second meeting: ILCSC Albrecht Wagner, ECFA/DESY, Prague, Nov02

  19. ILCSC Albrecht Wagner, ECFA/DESY, Prague, Nov02

  20. ELCSG Next meeting on 28 November 2002 at CERN: ...... Minutes etc 4) Discussion and agreement of composition of the accelerator subcommittee 5) Initiative from Loew panel members to form working groups on technology independent issues 6) Report of first meeting of organisational subcommittee 7) Overview or recent LC developments 8) Discussion of mechanism to make final choice of LC technology 9) Discussion of formation, terms of reference, etc of Outreach subcommittee 10) AoB Albrecht Wagner, ECFA/DESY, Prague, Nov02

  21. Accelerator Subcommittee • Terms of reference: • Act as source of accelerator expertise • Help coordinate the R&D on LC in Europe, help avoid unnecessary duplication and assure that all necessary areas are covered • Be link to other regional subcommittees • Chair:Reinhard Brinkmann Albrecht Wagner, ECFA/DESY, Prague, Nov02

  22. ELCSG Subgroup on Organisational Matters The charge is: • From a European Perspective, work out possible models for the design, construction and operation of a linear collider* as a truly international project. • Develop a road map towards setting up the project *This refers specifically to a 0.5 to 1.0 TeV electron-positron machine with a latest completion date of 2014. The members are: George Kalmus (chair) Torsten Akesson Ian Corbett Umberto Dosselli Jos Engelen Joel Feltesse Lorenzo Foa Eva Groniger Voss Peter von Handel Helmut Krech Chris Llewellyn Smith Norman McCubbin Guy Wormser NN Albrecht Wagner, ECFA/DESY, Prague, Nov02

  23. Organisation and Management The proposed organisational and management structure of the TESLA Project is based on the concept that • the responsibility for most subsystems is shared between different institutions and even regions, in order to exploit best the know-how available around the globe. The same principle is being implemented for ALMA. A specific proposal has recently been submitted to the German Science Council Albrecht Wagner, ECFA/DESY, Prague, Nov02

  24. The Project Parties The funding sources which create and sustain theTESLA Projectare called the Parties. The Parties have two initial responsibilities: • To establish jointly, and by agreement, an oversight body for the Project, the TESLA Board. The TESLA Board has the responsibility to establish and supervise the Project. • To each appoint Executive Agencies, or Executives, to provide the overall management of those Project tasks and responsibilities that are agreed to belong to each of the Parties. If desired, several parties can appoint a joint Executive. Albrecht Wagner, ECFA/DESY, Prague, Nov02

  25. The TESLA Board • The TESLA Board is the oversight body for the Project, it has the responsibility to establish and supervise the Project. • The TESLA Board • organises the Joint TESLA Office (JTO) that directs and manages the overall Project. • It appoints the senior management, specifically the Directors. • It defines the responsibilities and authorities of each of the key personnel. • It appoints the Science Advisory Committee and the Management Advisory Committee. Albrecht Wagner, ECFA/DESY, Prague, Nov02

  26. The Joint TESLA Office The Joint TESLA Office (JTO) carries out its management function by specifying the scope, schedule, and tasks of the Project and by managing the efforts of the Executives to provide the necessary deliverables. The Joint TESLA Office is responsible for the implementation of the Project. It is led by a small board of Directors and includes the top-level organisation. The Directors have the responsibilities and authorities as defined by a special agreement. Albrecht Wagner, ECFA/DESY, Prague, Nov02

  27. The Executive Agencies • The Executive Agencies, or Executives, • provide the overall management of those Project tasks and responsibilities that are agreed to belong to their funding Parties. - staff and fund the TESLA Project. • are legal entities and can enter into contracts, employ staff, etc., on behalf of the Project. • It is proposed to have at least three Executives, representing the Americas, Asia, and Europe, combined with a range of regional agreements. • In order to carry out their project functions each of the Executives will create a Regional Project Officeand secure for that office the staff and resources necessary for the performance of the tasks assigned to that Executive. Albrecht Wagner, ECFA/DESY, Prague, Nov02

  28. The Regional Project Offices • The work packages will be carried out by existing institutions in the different regions, under the responsibility of the Regional Project Offices. • The Regional Project Offices will be responsible for ensuring that the resources are made available to carry out the work packages to performance and schedule. • Each work package will be covered by a formal agreement between the institutions concerned. Albrecht Wagner, ECFA/DESY, Prague, Nov02

  29. The Integrated Product Teams • The project management structure is based on the concept of Integrated Product Teams (IPTs). • The Integrated Product Teams manage the individual tasks, as defined in the first level of the Work Breakdown Structure. • The implementation of IPTs as task managers reflects the fact that the responsibility for most subsystems are shared between different institutions and even regions. This is to exploit best the know-how available around the globe and to ensure that the know-how is shared between the several Executives. For this reason the leadership for those level-1 tasks is also shared. • Each IPT consists of all those individuals who are assigned by one or several of the Executives with significant responsibility for work elements within a given level-1 WBS task. Albrecht Wagner, ECFA/DESY, Prague, Nov02

  30. Executive Project Office Executive Project Office Executive Project Office IPT 1 Site IPT 2 SC Mod‘ls IPT 3 DampRing IPT n FinFocus IPT n+1 Detect ........ Governments = Parties TESLA Board Joint TESLA Office Director + key personnel Project Office = Regional Project Managers Amer. labs Asia labs Europ. labs Integrated Product Teams Albrecht Wagner, ECFA/DESY, Prague, Nov02

  31. GAN • Remote operation will very likely be of key importance for the future operation of large facilities. • Key issues: • social aspects • Tests in this area are ongoing or planned (TTF, A0, LINX, PI3…) ICFA is considering to sponsor future GAN workshops Albrecht Wagner, ECFA/DESY, Prague, Nov02

  32. OECD Consultative Group Albrecht Wagner, ECFA/DESY, Prague, Nov02

  33. OECD Consultative Group ... Discussion on organisational issues etc It was decided to continue these OECD discussions….. Albrecht Wagner, ECFA/DESY, Prague, Nov02

  34. Continuation of CG • GSF felt that Consultative Group (CG) should continue in a form to be decided by the interested countries • UK should continue to be the lead country • Non-OECD representatives must be invited • Majority of CG work related to LC • Next meeting of GSF in Jan 03, proposal of charter by CG should then be available • Meeting of QECD science ministers in early 2004 • Therefore: Meeting of CG March/April 03 and Nov 03 Albrecht Wagner, ECFA/DESY, Prague, Nov02

  35. New ECFA Study on Physics and Detectors for a LC • The organising committee of the Extended ECFA/DESY Study proposes that ECFA should support these activities for a further two years, from Spring 2003. • The ILCSC is relying on the studies in the three regions to provide input on Physics and Detectors. Both the USA and Asia plan continued studies. • The present ECFA/DESY Study involves a widely distributed group of experimenters and theorists doing feasibility studies, fundamental calculations and R&D. • The study will help the momentum of this work in Europe to be kept up to maintain contributions to the formation of an international user community. • The present study comes to an end with its workshop in Amsterdam, 1-4 April 2003. ECFA is asked to approve the new Study at their November 2002 plenary meeting. Albrecht Wagner, ECFA/DESY, Prague, Nov02

  36. Conclusion The Science Council has evaluated TESLA with its two goals very favourably and made a positive recommendation last week. The homework as asked for has been made The technical progress continues, the Technical Review was very helpful and positive for TESLA, inspite the fierce competetive atmosphere Organisational aspects are being addressed The community is organising itself internationally The political discussions have started Albrecht Wagner, ECFA/DESY, Prague, Nov02