1 / 7

Update on Interbull

Update on Interbull. Annual Meetings. Open, business, and SC meetings May 2002, Switzerland August 2003, Italy Technical workshop March 2003, Beltsville Topics: Longevity Calving ease Female fertility. August Run Changes. Relatively quiet – with only a few changes:.

caelan
Download Presentation

Update on Interbull

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on Interbull

  2. Annual Meetings • Open, business, and SC meetings • May 2002, Switzerland • August 2003, Italy • Technical workshop • March 2003, Beltsville • Topics: • Longevity • Calving ease • Female fertility

  3. August Run Changes Relatively quiet – with only a few changes: BSW type (not official in US) IRL new data excluded Improved data verification

  4. September Test Run GUE first run for type BSW overall conformation added JPN included for production & type NZL included overall conformation AUT and DEU BSW data combined Flemish part of BEL joined NLD Walloon part of BEL moved to TDM

  5. Second Country Rule Tested or AI sampled and official

  6. BSW Type Test Run Results

  7. Websites • www.interbull.org • Publications & bulletins • Evaluation summaries • aipl.arsusda.gov • Documents • Downloadable files • Access to all evaluations

More Related