An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mopra/ATCA report LBA Ops mtg - Feb ‘05 Tasso Tzioumis

  2. Mopra - 1 • New ACC in 2004 • Teething problems - networking • All ok now • Extensive monitoring via web • Emulation of old interfaces • Remote subreflector focus • Move to Unix • Plan to retire VAX • New machine at Mopra now • Port of software underway • No progress/plans to integrate with PCFS

  3. Mopra -2 • New mm-Rx not in yet - Sept ‘05? • Mm season 1/2 old + 1/2 new Rxs • VLBI scheduled for May - avoid mm • Plan to try mm VLBI - still keen - new Rx • New 22 GHz Rx also • Remote operation • Project underway • Security and monitoring main issues • VLBI remote already possible

  4. Mopra -3 • Network connections slow • Currently at 128 kbps • In Nov ~60kbps for monitor to Nar !! • Need to utilise more efficiently • Testing in progress • Huygens observations • 2 DAS installed • Aug ‘04 tests failed due to Vax disk failure • 512 Mbps operations successful • Special IF conversion built ( --> New Norcia?) • Real-time fringe tests ok

  5. Mopra - Issues • Needs permanent eVLBI computer • Setup still complex - specialist need • No local staff - support difficult • But Martin and Sean from ATCA at Coona and available on emergencies • Robina only local observing support

  6. ATCA -1 • New ACCs fully operational • New mm-Rx operational • New 22 GHz Rxs • Fractional MHz possible • Mixup with polarisation changes --> VLBI obs at 22 GHz in wrong polarization need to be repeated. • Phasing of array at 22 difficult • Need to experiment with setup and schedules • Schedule frequent phase-up cals?

  7. ATCA - 2 • Transition to Unix in progress • CATIE? - ported/changed? • Tsys and other logs? • Other VLBI issues? • Would like local “Narrabri VLBI person” • Missing Steven…. • Need at least 2 observers/session • eVLBI issues?