140 likes | 239 Views
Do we have an Aperture Kicker for the LHC?. Kicker Hardware Kick Classification Examples DA at Injection and Collision Conclusion. Kicker. Puls Generator. MKQ. MKA. Circuit Diagram. 3300V. 800V. 900V. The “Keys” in CCR. Kick Classification. Linear Coupling (SPS) R. Tom ás et al.
E N D
Do we have an Aperture Kicker for the LHC? Kicker Hardware Kick Classification Examples DA at Injection and Collision Conclusion LHCCWG - Frank Schmidt, ABP
Kicker LHCCWG - Frank Schmidt, ABP
Puls Generator MKQ MKA LHCCWG - Frank Schmidt, ABP
Circuit Diagram 3300V 800V 900V LHCCWG - Frank Schmidt, ABP
The “Keys” in CCR LHCCWG - Frank Schmidt, ABP
Kick Classification LHCCWG - Frank Schmidt, ABP
Linear Coupling (SPS) R. Tomás et al. Linear coupling compensation and tracking data at all BPMs to compare the machine model to the data Linear coupling can be treated as any other resonance LHCCWG - Frank Schmidt, ABP
Missing Sextupoles (SPS) (F. Schmidt, R. Tomas et al.) Before Specially arranged SPS configuration for extraction sextupoles + + + + - - - - (3,0) resonance driving terms Data fully decohered (factor 2 correction applied) Comparison with nominal model One extraction sextupole accidentally disconnect After LHCCWG - Frank Schmidt, ABP
Uncompensated Skew Sextupole Resonance (PSBooster) (P. Urschütz, M. Benedikt) phase space vertical motion CERN PS data vertical plane 3Qy = 16 and (0, -2) spectral line Uncorrected machine beam losses FFT LHCCWG - Frank Schmidt, ABP
Corrected Skew Sextupole Resonance (PSBooster) (P. Urschütz, M. Benedikt) phase space CERN PS data vertical plane 3Qy = 16 and (0, -2) spectral line Resonance compensated with skew sextupoles Setting based on the reduction of the (0, -2) line amplitude vertical motion beam losses FFT LHCCWG - Frank Schmidt, ABP
Dynamic Aperture SPS 1988/89Gareyte, Hilaire, Schmidt et al. LHCCWG - Frank Schmidt, ABP
DA at Injection and Collision LHCCWG - Frank Schmidt, ABP
Conclusion • Except for may be the AC-dipole at Injection the answer to the original question is: NO, we do not have an Aperture Kicker!! • BUT: If we are really courageous we can upgrade the MKA from 890V to 4kV Injection: 22.5 s Collision: 6.3 s • No hardware upgrade except: LHCCWG - Frank Schmidt, ABP
“Back” of Puls Generator LHCCWG - Frank Schmidt, ABP