110 likes | 197 Views
UM – System A.I.T.S. PeopleSoft Implementation Plan By Ben Phelps. Transition Factors. Relational (SA, FS, HR, EPM) Integrated (UM, MU, UM-R, UMKC, UMSL, HOSP, etc.) Row Level Security (bittersweet) Effective Dating
E N D
UM – System A.I.T.S. PeopleSoft Implementation Plan By Ben Phelps
Transition Factors • Relational (SA, FS, HR, EPM) • Integrated (UM, MU, UM-R, UMKC, UMSL, HOSP, etc.) • Row Level Security (bittersweet) • Effective Dating • Multiple Relationships within System • Data stored in single location
Architecture SA FS HR EPM
Architecture SA FS HR EPM
HR PRD 76* (Dynamic) HR RPT 76* (Static) HR TRN 76* HR DEV 76 HR TST 76 HR CNV 76 HR QA 76 HR CNV 83 HR TST 83 Plus ODBC * User interface Database Instances
Enterprise Performance Management HR RPT FS RPT SA RPT
Enterprise Performance Management HR RPT HR ODS FS RPT FS ODS SA RPT SA ODS
Enterprise Performance Management HR RPT HR ODS Warehouse (engine) FS RPT FS ODS SA RPT SA ODS
EPM (continued) • Cubes (multi-dimensional reporting) • Balanced Scorecards (ties reporting to strategic plan) • Analytics (forecasting & scenarios)
UM – System A.I.T.S. Questions?