1 / 1

Platform

Mobile Landing Platform (MLP). Platform. Description. Speed 20 kts Transit Waterline (Loaded) 25.2 ft Crew 55 (MSC), 11 (LCAC Det) Embarked Landing Force 856 (128 Navy; 728 USMC) Medical Capability 1,281 ft2; 4 Ward Beds

Download Presentation

Platform

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mobile Landing Platform (MLP) Platform Description Speed 20 kts Transit Waterline (Loaded) 25.2 ft Crew 55 (MSC), 11 (LCAC Det) Embarked Landing Force 856 (128 Navy; 728 USMC) Medical Capability 1,281 ft2; 4 Ward Beds Potable Water 200,242 gal Surface Interface Point 2 Well Deck Capacity 6-LCAC Flight Deck (Level/Class) 1 Land/Launch Spot (I/2); VERTREP lift Spot (I/4) UAS Adjacent Space 1000 ft2 Ramp 1 Self-depl LMSR/MLP Veh; 1 Portable Veh access Vehicle Square (Ro/Ro) 51,560 ft2 (Stowage for50 ISO 1CC Containers) Lifting Capability (lbs) 1 52.9K single boom container crane,130’ lift radius 2 22K extended boom stores crane (port/stbd) 2 11K bridge cranes (LCAC lanes) (port/stbd) Cargo Fuel (JP-5) 1 mil gal Motor Gasoline (MOGAS) 550 gal (jettisonable drums) 3 MLP New Design and Build MPF(F) MLP VS(1) Requirements Validation Study February 6, 2008 Placemat Program Status Issues • CDD Increment 1 • JCB 13 Feb 2008 Approved • JROC Approval March 2008 • DAB Jun 2008 (Pending ADM signature) • Acquisition strategy approved – Supports RFP Jul 2008 • Systems Design Award 15 Sep 2008 • Milestone B FY10 • Procurements • 1 (FY10) Delivery (FY15) • 2 (FY12); Delivery (FY16) • 3 (FY13); Delivery (FY17) • Ship 2 & 3 funding addressed during POM-10 • Program of Record is for 3 ships • Key Sea Basing Enabler • Use of Float On Float Off (FLO/FLO) Commercial technology • TEU handling Capability added • Will Require additional C4I upgrades to support MEB CE and Air Space Management task if “Big Decks” are omitted • Vehicle Transfer System (VTS) is new technology 6-4

More Related