1 / 3

In slide show mode: slides advance automatically, fade-in, fade-out. Enjoy!

or. In slide show mode: slides advance automatically, fade-in, fade-out. Enjoy!. REALITY CHECK: Each of these disasters involved a process flaw Systemkey ™ competitors’ failed to catch. If “their way” worked, we wouldn’t have:. Lehman, Sep 2008 $613B bankruptcy

Download Presentation

In slide show mode: slides advance automatically, fade-in, fade-out. Enjoy!

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. or In slide show mode: slides advance automatically, fade-in, fade-out. Enjoy!

  2. REALITY CHECK:Each of these disasters involved a process flaw Systemkey™ competitors’ failed to catch.If “their way” worked, we wouldn’t have: Lehman, Sep 2008 $613B bankruptcy Residual Risk: financial deception/fraud AIG 2008-2009 $182.5B bailout Residual Risk: financial incompetence/deception/fraud BP Deepwater, Apr 2010 $40B cleanup+settlements Residual Risk: untested, unproven processes Costa Concordia Jan 2012 17 confirmed dead, 15 missing, $800MM vessel lost + ?? in settlements? Residual Risk: multiple process violations, lack of feedback (false negative) on switching off approved route monitor Enron, Dec 2001 $63.4B bankruptcy Residual Risk: financial deception/fraud MCI Worldcom, July 2002 $107B bankruptcy Residual Risk: financial deception/fraud Fannie Mae/Freddie Mac, Sep 2008 $291B takeover Residual Risk: financial incompetence/deception/fraud Chernobyl, Apr 1986 est. 985,000 event-driven, cancer-related deaths 1986-2004, cleanup est. $605MM to-date Residual Risk: failed communication, lack of training Piper Alpha North Sea, July 1988 167 died, $3.4B cleanup Residual Risk: violated design parameters, lack of full maint status sit-rep Mars Climate Orbiter, Sep 1999 $125MM loss of spacecraft Residual Risk: mix-up between English & metric units Three Mile Island, Mar 1979 $1B cleanup, $1MM fine each day didn't deliver power Residual Risk: confusing signage; faulty ergonomics Kansas City Hyatt, July 1981 114 died, 216 severely injured $140MM cleanup+settlements Residual Risk: poor communication, fail to validate new drawings Bhopal, Dec 1984 3,787 died, est. 3,900 injuries+birth defects $470MM settlement, remaining envir cleanup Residual Risk: malfeasance, safety systems turned off Tacoma Narrows Bridge, Nov 1940 $8MM cost to construct, lasted 4 months! Residual Risk: invalid scientific theories Thalidomide, 1957-1962 est. 1500 died/15,000 birth defects, $20MM trust fund Residual Risk: invalid scientific theories Tenerife, Mar 1977 583 died, $110MM settlements, loss of two planes Residual Risk: early take-off/lack of standard phraseology

  3. Questions? Thank you for your interest! Matthew E. Weilert Systems Thinking Institute LLC systhink@systemkey.net +1-866-288-0530 North America +1-847-227-3006 International

More Related