1 / 17

Presentation Outline

Economic, CO2 and Security performance of power system operation with carbon capture plant and renewable generation (Theme A5 - UK Real Time Energy Supply and CCS Plant) Anser Shakoor, Cheeyong Chen, Goran Strbac (Imperial College London) ( UKCCSC meeting – Nottingham- 18 April 2007).

Download Presentation

Presentation Outline

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Economic, CO2 and Security performance of power system operation with carbon capture plant and renewable generation(Theme A5 - UK Real Time Energy Supply and CCS Plant)Anser Shakoor, Cheeyong Chen, Goran Strbac (Imperial College London)(UKCCSC meeting – Nottingham- 18 April 2007)

  2. Presentation Outline • Objectives • Modelling CC technologies • Case studies • Results

  3. Project Objectives: Development and implementation of a simulation (system operation) platform to evaluate the cost, CO2 and security performance of UK power generation system, with carbon capture applied to conventional (fossil fuelled) generation.

  4. Key Questions: • How the introduction of carbon capture technologies impact on the technical, economic and environmental performance of UK generation system? • How the combination of carbon capture process and high penetration of intermittent renewable (wind) generation influence the UK power system operation?

  5. Modelling CC Technologies -1 • a - Post Combustion Capture • Approx. 85% CO2 is removed through amine scrubbing of flue gases. • Does not alter the combustion process and provides flexibility • Solvent regeneration & CO2 compression is required that needs large amount of energy (~ 10% of plant capacity effected) • Option-1: store solvent thus reclaiming plant capacity during high demand periods, with later regeneration during low demand periods. • Option-2: stop carbon capture during high demand periods (associated with high CO2 release to atmosphere).

  6. Modelling CC Technologies -2 Summary of different modes of operation in post combustion CC

  7. Modelling CC Technologies -3 • b – Pre Combustion Capture • Uses fuel conversion before combustion/conversion • Operating characteristics of pre combustion plant (less flexible) is very different from post combustion plant • Can not be operated like solvent storage in post combustion as continuous removal of CO2 is required (also high pressure vessel req.). • Limited gain of simple venting as most of the CC related energy is consumed before removal of carbon. • Plants with pre combustion carbon capture are modelled as inflexible with 10% reduction in their output

  8. System Description -1 • Demand: • Pk. Demand = 57 GW, Min. Demand = 18GW • Annual hourly demand profile considering 6 characteristic days, three seasons (winter, summer and spring/autumn) and two types of days (business and non business day). • Demand is assumed to be fully predictable (i.e., impact of demand forecasting error is not included).

  9. System Description -2 Generation System • WIND GENERATION: Annual hourly generic UK wind generation profile is used to represent 26 GW (20%) of wind generation capacity installed

  10. Reserve Requirement & Provision • Two cases of reserve provision: • Entire reserve provided by synchronised plant • Part of reserve provided by conventional synchronised plant and rest by standing reserve form; a) OCGTs, b) Carbon capture plant • Amount of reserve req. derived from the standard deviation of wind variations (4-hr time horizon)

  11. Model Output Simulation of system operation (hour by hour, year round) with 26 GW of wind capacity, taking into consideration daily and seasonal demand changes and variations in wind output provides the following key output per annum. • energy produced by conventional plant • CO2 emissions • generation cost including cost associated with carrying spinning reserve • energy not supplied (due to insufficient reserves and constraints on ramp rates) • wind generation curtailed (due to minimum stable generation constraints and constraints on ramp rates) • energy produced by OCGTs (when OCGT plant is used)

  12. Preliminary Results

  13. Reduction in fuel cost • 10% (950MW) of the total CC plant capacity is available for provision of standing reserve • Assumption: cost of OCGT is 50£/MWh (in contrast to marginal cost of synchronised plant of 20£/MWh)

  14. Reduction in CO2 Emissions • Assuming that standing reserve plant emit 0.6 tonne/MWh compared to 0.4 tonne/MWh by synchronised plant.

  15. Reduction in thermal energy / Increase in Utilization of Wind energy

  16. Further Work • Model enhancement including: • Effect of demand forecast errors • Reserve req. assessment based on temporal wind & demand level • Oxy fuels • Start-up costs…. • Further studies involving real systems, levels of system security, fuel prices, …… • Documentation of developed model and results (report)

  17. Economic, CO2 and Security performance of power system operation with carbon capture plant and renewable generation(Theme A5 - UK Real Time Energy Supply and CCS Plant)Anser Shakoor, Cheeyong Chen, Goran Strbac(Imperial College London)(UKCCSC meeting – Nottingham- 18 April 2007)

More Related