1 / 6

3 Major Outcomes as Project Objectives……

Integrating Climate Change Risks into Water & Flood Management by Vulnerable Mountainous Communities in the Greater Caucasus Region. 3 Major Outcomes as Project Objectives……. Major Outcomes Expected….1. Water & Flood Management Policy & Regulatory Frameworks to Respond to Climate Change Risks.

camden
Download Presentation

3 Major Outcomes as Project Objectives……

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Integrating Climate Change Risks into Water & Flood Management by Vulnerable Mountainous Communities in the Greater Caucasus Region

  2. 3 Major Outcomes as Project Objectives……

  3. Major Outcomes Expected….1 • Water & Flood Management Policy & Regulatory Frameworks to Respond to Climate Change Risks • Legislative review (completed) • Institutional Review (to be finalised shortly) • Draft Institutional construct to be presented by June • Consultations to follow • Outline Normative Laws to be prepared • Consultations to follow • Wider Consultations on IWRM Laws and Policy to take place by year end. • Ongoing contributions to LWG on WR Policy

  4. Major Outcomes Expected…1 • Water & Flood Management Policy & Regulatory Frameworks to Respond to Climate Change Risks • Develop Conjunctive Water Management Model • Review of Existing Software Available • Initiate Hydrologic and Hydrogeological Studies • Carry out Well Drilling Programme mid-2014 (Initiate asap) • Build CWM Model late 2014 (after results of well drilling) • Deliver Training in CWM and produce Guidelines

  5. Major Outcomes Expected…2 • Key Institutions Have Capacities, Technical Skills, Tools & Methods to Apply Advanced Climate Risk Management Practices for Water Stress & Mitigation • Training Programme • Institutional Review undertaken • Institutional Capacity Development Plans to be prepared • Prepare and implement training in IWRM Practice • Watershed level resource utilisationmodelling • Flood Risk Mapping • Hydromet Monitoring Strengthened • Community-Based EWS (Dissemination & Response)

  6. Major Outcomes Expected…3 • Community Resilience to Floods & Water Stress Enhanced • WUA Strengthened • Local Multi-Stakeholder Committees Established • Decide on mix of options (Structural & Non-structural) • Evaluate existing structures • Prepare options for consultation • Water resources assessment (surface & groundwater) • Conjunctive Water Management • IWRM Plans for 3 Pilot Basins • Implementation of Plans in 3 Pilot basins………..