Activités de recherche au LGI. Céline Gicquel. Supply chain planning matrix. Procurement. Production. Distribution. Sales. long term. Supply Network Design. mid term. Master Planning. Demand Planning. short term. ProductionPlanning. DistributionPlanning.
E N D
Activités de recherche au LGI Céline Gicquel
Supply chain planning matrix Procurement Production Distribution Sales long term Supply Network Design mid term Master Planning Demand Planning short term ProductionPlanning DistributionPlanning Materials Requirements Planning Transport Planning Demand Fulfilment Scheduling
Short-term production planning Customer demand Resource Raw materials A production resource with a limited capacity and significant startup operations Finished products
1 2 3 4 5 6 7 8 9 10 50 50 50 Setup costs=500€; Inventory holding costs=1420€ Basic lot-sizing problem • Simple example • 1 single product, 10 planning periods • Production capacity: 50 units/period • Setup costs = 500€ ; Inventory holding costs=2€/unit/period • Demand: • Objective 1: minimize setup costs
1 2 3 4 5 6 7 8 9 10 30 20 50 50 Setup costs=1500€; Inventory holding costs=100€ Basic lot-sizing problem • Simple example • 1 single product, 10 planning periods • Production capacity: 50 units/period • Setup costs = 500€ ; Inventory holding costs=2€/unit/period • Demand: • Objective 2: minimize inventory holding costs
1 2 3 4 5 6 7 8 9 10 50 50 50 Basic lot-sizing problem • Simple example • 1 single product, 10 planning periods • Production capacity: 50 units/period • Setup costs = 500€ ; Inventory holding costs=2€/unit/period • Demand: • Objective 3: minimize setup and inv. holding costs Setup costs=1000€; Inventory holding costs=220€
PhD thesis • Studied extensions • Multiple products • Multiple resources • Sequence-dependent changeovers • Difficult deterministic optimization problems • Solution approach • Mixed integer linear programming • Tight formulations + solver
On-going work • Lot-sizing with parallel resources • Valid inequalities • Heterogenous resources • Collaboration with Pr Wolsey • European project CAP-SCHED • Batch scheduling • Simulation+optimization • Multi-agent system