Sequence of the assembly of the Absorber

Sequence of the assembly of the Absorber. Insert Absorber Window into main body using the pre-threaded joint. Seal weld at nib. Weld the AL5456 tube into the pre-machine nib at main body. Leak test the space between Safety and Absorber Window at this point.

Download Presentation

Sequence of the assembly of the Absorber

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Sequence of the assembly of the Absorber

  2. Insert Absorber Window into main body using the pre-threaded joint. Seal weld at nib.

  3. Weld the AL5456 tube into the pre-machine nib at main body. Leak test the space between Safety and Absorber Window at this point

  4. Insert the S.S heat conduction tube and weld it to the pre-buttered Inconel piece.

  5. Insert the main support tubes from both ends. One slot to be machined at tube to allow to pass the Vacuum pipe which has G10 collar fitted to gain additional support from this tube

  6. Insert and weld the GHe and LH2 pipes before assembling into the Coil tube.