50 likes | 217 Views
Soriana/Super City. Soriana/Super City Customer Profile. Founded in 1968 by entrepreneurs and brothers, Francisco and Armando Martín Borque, Soriana is a public company and a major retailer in Mexico with more than 606 stores.
E N D
Soriana/Super City Customer Profile Founded in 1968 by entrepreneurs and brothers, Francisco and Armando Martín Borque, Soriana is a public company and a major retailer in Mexico with more than 606 stores. The company currently operates under the brands Soriana, Clubes City Club, Hipermart, Mercado Soriana, and Super City. Super City is the company's convenience store division brand and competes primarily with H-E-B, Comercial Mexicana, Chedraui, S-Mart and Walmex. Soriana emphasizes that it is Mexican-owned and operated.
Soriana/Super City – NK Constructions (Mexico) • A snapshot of the installation: • Super City convenience store in Chihuahua, Mexico • 2,400 square feet • Retrofit application, installed in June 2012 • One C60 – performing all the cooling, replacing the 5 Ton heat pump unit in the summer • 50% of working air goes to cool the warehouse, which in the past did not have any ventilation • During the winter the C60 is shut down and the 5 Ton heat pump unit heats the space NK Constructions is the Coolerado dealer in Mexico working with Soriana to deploy more Coolerado units in their stores.
Soriana/Super City – NK Constructions (Mexico) Installation Highlights: Soriana/Super City originally thought the astonishing energy reduction results would be impossible, but agreed to do a pilot on one store. To validate the energy savings, Super City contracted a 3rd party company to run data monitoring – confirmed data was true. After validating the energy savings provide by Coolerado, they decided to move forward and install Coolerado units on four more locations with larger footprint stores. Customer Quotes: “The smell is better and the air feels fresher and more consistently cool. The quality of the air is better and we are not experiencing product damage due to the high heat conditions we used to have. – Super City, Store Manager • INSTALATION RESULTS • 5 months pilot in 2012 • 5,470 kW reduction in 2012 vs. 2011 – same period • 1,094 kW/month reduction • 7kW Reduced demand • 70% less energy used vs. DX cooling • The C60 cooled the space 24 hrs a day, while the DX unit did it for only 13 hrs a day • Used original duct configuration • 2.8 Years Return on Investment