1 / 6

Force Recovery Processes

Force Recovery Processes. Cooperation and synergy. Recovery Processes Main activity Work shops MIOR Surfactant flooding OG21/Force RP - Enhanced recovery by water additives CO2 – seen from the underground (Autumn 2007) No common research project defined from Force RP.

caraf
Download Presentation

Force Recovery Processes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Force Recovery Processes Cooperation and synergy

  2. Recovery Processes • Main activity • Work shops • MIOR • Surfactant flooding • OG21/Force RP - Enhanced recovery by water additives • CO2 – seen from the underground (Autumn 2007) • No common research project defined from Force RP

  3. Potential for cooperation and synergy within Force for the RP group • Reservoir characterisation • Improvements on screening software (EOR methods, (PRIZE)) • Improvements on advanced reservoir simulators (EOR) • Geophysics • Imaging and mapping of residual oil saturation (the EOR potential)

  4. Work shop Force RP-OG21 – Enhanced recovery by water additives • Goal of the work shop. • Discuss the technological gaps defined in the OG21 strategy document • Encourage to new ideas/sketches that could lead to new project proposals within the focused areas (Petromaks & Demo2000) • EOR process understanding challenges • EOR simulation challenges • Pilots and field testing challenges • Group discussions (3 subjects – 5 groups) • Plenary presentations of group work and discussion • Opening by Gunnar Berge • 59 participants

  5. Force RP and OG21-TTA3 workshop • Conclusions: • Need a locomotive – a pilot • Need for an updated NCS potential overview • Conclude on what to do next • Need feedback from the oil companies on what to priorities • Overview of oil companies ongoing R&D activities within EOR • The academia and research institutes – lead on new projects/research

More Related