An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CDR planning Requirements/Performance simulations are the most critical part: • Near-final detector layouts for simulation: Sept 2010 • Near-final simulation software tools ready: Sept 2010 • Benchmark list and list of participants in benchmark studies: Aug 2010 • Start production (first iteration): Sept 2010 • Start production (last iteration): Nov 2010 • Performance studies: Oct 2010-Feb 2011 CDR editing schedule: • Overview of contents and work plan for each chapter: Aug 2010 • Deadline for individual chapter text: Mid-Feb 2011 • First full version of Volume 3: end-Feb 2011 • First full version of Volume 1: mid March 2011 • Final deadline mid-April 2011 In addition, lots of work on: physics potential / engineering / integration / magnet systems / cost / R&D plans… LL, weekly meeting, 22/6/2010

  2. CDR editing: next steps • Chapter editors of each chapter shall get in contact. • Devise a rather detailed plan of what the chapter shall contain (including a list of the drawings, tables and plots one would like to include in the document). • Discuss the plan with the main editors and with the main stake-holders (e.g. WG’s) in an iterative process. • Deadline mid-August for each chapter • This will allow to prepare focused work-plans and adjust/allocate resources. Note: main editors Harry, Marcel, Lucie will be at CERN during the period July 6-20. We would like to use this period to make maximum progress with the above process. LL, weekly meeting, 22/6/2010

  3. About “production” Marcel Stanitzki’s estimate: Propose to schedule a meeting on “standard model background” Friday July 9th at 14 hrs About: What is available ?Do’s and don’t’s Full SM background for all processes, piecemeal or extract selections Generators to use Estimates of processing times, and ways to proceed / share the work Proposals for people to invite and for presentations welcome LL, weekly meeting, 22/6/2010