Lecture 16: Network Models/ Scheduling Assignments

Lecture 16: Network Models/ Scheduling Assignments. AGEC 352 Spring 2011 – March 28 R. Keeney. Olympic Swimming. Michael Phelps is the world’s greatest swimmer If you need to win a race, you pick him If you need to win a relay race, you pick him but where do you use him? Medley swimming

Download Presentation

Lecture 16: Network Models/ Scheduling Assignments

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lecture 16: Network Models/ Scheduling Assignments AGEC 352 Spring 2011 – March 28 R. Keeney

  2. Olympic Swimming • Michael Phelps is the world’s greatest swimmer • If you need to win a race, you pick him • If you need to win a relay race, you pick him but where do you use him? • Medley swimming • Backstroke, Breaststroke, Butterfly, Freestyle

  3. Medley Swimming (U.S. 2008)

  4. Sales Reps / Districts If these people are paid on commission is Seller A going to be happy about being the highest rated rep?

  5. Assignment Problems • Setup is identical to the transportation problem we have considered • Sources are people or things to be assigned • Destinations are jobs or roles to be filled • Other applications • Machines to tasks • E.g. Airplanes to routes • Sudoku (number to a cell)

  6. Example • Umpiring in American League Baseball • 14 teams • 7 umpiring crews assigned to 7 games • Minimum travel costs for crews going to games, other constraints • No afternoon games in city B if you worked a night game in city A the previous day • Day off required if leaving Pacific Time Zoneor Canada • Crew must not work more than one week straight on the same team’s games

  7. Case • Mathematical allocation of ‘n’ objects or agents to ‘n’ tasks • Agents/objects are indivisible, one task only • Autopower Company audit of assembly plants (destinations from transport) • Leipzig, Nancy, Liege, Tilburg • VP’s to manage audit • Finance, Marketing, Operations, Personnel

  8. Considerations on Costs • Expertise relative to problem areas of different plants • Time demand of VP • Language ability of VP

  9. Estimating the costs • Need something reliable for estimating the opportunity cost of each VP in each assignment • E.g. A Dutch speaker in the French plant may require a translator with him full-time • E.g. The finance VP may need an human resources specialist to assist her • Other measures: • Swimming times, skill tests (ASVAB)

  10. Solving • Simplex LP in Excel or by hand • For small problems, enumeration • An ‘n’ sized assignment problem has n! possible solutions • n! is called a factorial, multiply all the integers up to n together to find the factorial • E.g. 4! = 1*2*3*4 = 24

  11. Setup • RHS values are always 1 • Sources (people) • The total jobs must be <= 1 • Destinations (jobs) • The number in the job must be >= 1 • Balanced: Need someone for each job, everyone needs a job

  12. Algebraic Form

  13. Notes • Decision variables will be zero or one. • Integers (but you don’t need integer constraints) • Transportation problem with supply at each source and demand at each destination equal to one.