70 likes | 216 Views
Summary of progress IAF GD3 TF (April 2012). IAF GD3 meeting. 28 April 2012 : 13.00-17.00 15 participants from both ABs and CBs. IAF GD3 Components. Technical Components. IAF GD3. IAF/ILAC A5. IAF ML-series ML1, ML5, MLA. Co-operation components. IAF MoU.
E N D
IAF GD3 meeting 28 April 2012 : 13.00-17.00 15 participants from both ABs and CBs
IAF GD3 Components TechnicalComponents IAF GD3 IAF/ILAC A5 IAF ML-series ML1, ML5, MLA Co-operation components IAF MoU
IAF MD xxx : Assessment of a CAB for Cross Frontier Accreditation
IAF MD xxx • Consensus of the TF is that the document should be mandatory • The TF has agreed a draft document for circulation to TC members for comment
Recommendation/Way forward • IAF TC give endorsement to the IAF GD3 TF to circulate the draft “Assessment of a CAB for cross frontier accreditation” to IAF TC members for 60 days comment according to IAF procedures; • The amended text for MoU will be discussed further by the TF.