BP, OQ & You. Why do we have OQ?. Walnut Creek. Bellingham Washington. ISNetworld BP Contractor Statistics. 235,712 - OQ Reports 15,623,253 - Total Contractor OQ Qualifications for BP 25% of all the records in ISN 1987 Jobs Archived in ISN.
E N D
Why do we have OQ? • Walnut Creek
ISNetworld BP Contractor Statistics • 235,712 - OQ Reports • 15,623,253 - Total Contractor OQ Qualifications for BP 25% of all the records in ISN • 1987 Jobs Archived in ISN
Our expectations for OQ covered task work… • Sign up with ISNetworld • Determine which BP approved vendor will be used to qualify your employees. • Currently BP accepts: • OQSG • NCCER • NACE • TDW & Clockspring
Expectations continued… • Qualify the employees who will be performing OQ covered tasks • BP will be requiring both a written and practical evaluation after January 1, 2008 • Ensure all qualification results are sent to your vendor in a timely manner for upload into ISNetworld • Once the job site has been created in ISNetworld contractor should receive an email notification to generate an OQ Report (s) • Review your employee qualifications against the qualifications assigned to the job ensuring there are no GAPS
Expectations continued… • It is the contractors responsibility to ensure that all of their assigned OQ covered tasks are performed or directed and observed by an OQ qualified employee. • If insufficient qualified employees are sent to the jobsite the job could be suspended until qualified employees are provided • If an employee is replaced on the jobsite due to illness, vacation, etc., the new employee must bring their most current OQ report, and give it to the BP project inspector
Using the Gap Matrix Tool An essential front end loading tool
Gap Matrix functions…. • BP uses this for project planning/front end loading • Ensure qualified employees have been assigned to the job • Look at one or all contractors • Single employee • multiple employees • View all tasks assigned to the job or specific tasks assigned to a specialty contractor (i.e. NDT, excavation, etc.) • Contractors now have the ability to run a Gap Matrix
Corrosion Prepare surface for coating by abrasive blasting Job Site Gap Matrix Tool
BP’s OQ path forward What is changing…..
DOT Audit Shares • DOT auditors are becoming more OQ savvy • Field audit findings…. • Focus is centered abnormal operating conditions (AOCs) • Auditors will be asking BP employees • Auditors will be asking contract employee • Checking qualifications at job sites • Checking to see if work is being performed correctly
Recent changes that affect contractors… • BP now accepts OQSG, NACE & NCCER as OQ providers for our contractors • January 1, 2008 written tests and performance verifications will be required for every task • ISNetworld working to distinguish between initial qualifications and requalifications • Initials will always require both a written and practical evaluation • Most requalifications will only require a written OR practical evaluation • Span-of-control is now task specific • Contractors can now run their own GAP Matrix
API-OQ Committee update… • Currently working on TPCP Standard • Small step toward portability • If OQ providers meets criteria?? • API-OQ Liquids operators will accept their programs • Allows contractors to use 1 provider for multiple operators • Revising covered task list and elements within the tasks • Revising the API 1161 Standard on Operator Qualification
Wrap-up • In order to make the jobs easier please work with BP project managers, construction supervisors & inspectors to meet the intent of the OQ rule • Follow the required procedures around OQ • Assign only the employees who will be working on the job to the jobsite in ISN • Continue to work safely • Continue to do the excellent job you have done for us in the past • If you are having issues with a job site in ISN, call the construction supervisor, project manager or team leader who hired you • Visit the BP OQ Website for contractors
BP’s External OQ Page http://www.bppipelines.com/OQRule.html Operator Qualification Welcome to the BP US Pipelines & Logistics Operator Qualification (OQ) page for contractors. Here you will find everything you need to know about our OQ Program. BP has been involved and is committed to the ASME B31Q Standard. Through 2008, BP will be adjusting our program to align with this standard. BP uses ISNetworld to track covered tasks performed by contractors on our Jobsites. At BP we are dedicated to developing and applying innovation through education and empowerment. Everything we do relies on people; no oil rig, pipeline or terminal produces ideas or drives results. Helpful Links & Documents BP Approved OQ Providers & Solutions OQ Contact Information • Bill Bannister - OQ Coordinator, PLBU Wlliam.Bannister@bp.com • Molly Louviere - Contractor Mgmt Specialist Molly.Louviere@bp.com